CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING IN CONSTRUCTION OF FOOTBALL STADIUM PERSIBA BALIKPAPAN

<p align="justify">The Football Stadium of Persiba Balikpapan is located at Jalan Mulawarman, Manggar, East Balikpapan, Balikpapan City, East Kalimantan. The stadium measures 205 m x 166 m and is located on an area of 585 m x 355 m. In the process of realizing the design of this stad...

Full description

Saved in:
Bibliographic Details
Main Author: INDRI MEUTIA - NIM: 15014032 , RIZKA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30569
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:30569
spelling id-itb.:305692018-07-02T09:53:06ZCONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING IN CONSTRUCTION OF FOOTBALL STADIUM PERSIBA BALIKPAPAN INDRI MEUTIA - NIM: 15014032 , RIZKA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/30569 <p align="justify">The Football Stadium of Persiba Balikpapan is located at Jalan Mulawarman, Manggar, East Balikpapan, Balikpapan City, East Kalimantan. The stadium measures 205 m x 166 m and is located on an area of 585 m x 355 m. In the process of realizing the design of this stadium project, it is necessary to have a construction engineering management planning that includes methods of construction, project scheduling and project cost estimation. <br /> <br /> The method of construction begins with preparatory work, continues with the work of the lower structure which includes spun pile foundation, pile cap and tie beam. The upper structure of the stadium consists of column, beams, plates and steel roof truss. The reinforced concrete will be constructed with cast method in place and using PERI formwork. Then the work of drainage system include subsea drainage work and surface drainage. <br /> <br /> Project scheduling is done with the help of Ms project software with input of individual work duration and logic of dependency of the project. This, contributes to knowing the overall duration and the critical path of the project. <br /> <br /> The estimated output cost of construction on this project is the result of engineer's estimate which includes direct and indirect cost. The cost estimation process uses unit price and resource enumeration methods. <p align="justify"> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">The Football Stadium of Persiba Balikpapan is located at Jalan Mulawarman, Manggar, East Balikpapan, Balikpapan City, East Kalimantan. The stadium measures 205 m x 166 m and is located on an area of 585 m x 355 m. In the process of realizing the design of this stadium project, it is necessary to have a construction engineering management planning that includes methods of construction, project scheduling and project cost estimation. <br /> <br /> The method of construction begins with preparatory work, continues with the work of the lower structure which includes spun pile foundation, pile cap and tie beam. The upper structure of the stadium consists of column, beams, plates and steel roof truss. The reinforced concrete will be constructed with cast method in place and using PERI formwork. Then the work of drainage system include subsea drainage work and surface drainage. <br /> <br /> Project scheduling is done with the help of Ms project software with input of individual work duration and logic of dependency of the project. This, contributes to knowing the overall duration and the critical path of the project. <br /> <br /> The estimated output cost of construction on this project is the result of engineer's estimate which includes direct and indirect cost. The cost estimation process uses unit price and resource enumeration methods. <p align="justify">
format Final Project
author INDRI MEUTIA - NIM: 15014032 , RIZKA
spellingShingle INDRI MEUTIA - NIM: 15014032 , RIZKA
CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING IN CONSTRUCTION OF FOOTBALL STADIUM PERSIBA BALIKPAPAN
author_facet INDRI MEUTIA - NIM: 15014032 , RIZKA
author_sort INDRI MEUTIA - NIM: 15014032 , RIZKA
title CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING IN CONSTRUCTION OF FOOTBALL STADIUM PERSIBA BALIKPAPAN
title_short CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING IN CONSTRUCTION OF FOOTBALL STADIUM PERSIBA BALIKPAPAN
title_full CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING IN CONSTRUCTION OF FOOTBALL STADIUM PERSIBA BALIKPAPAN
title_fullStr CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING IN CONSTRUCTION OF FOOTBALL STADIUM PERSIBA BALIKPAPAN
title_full_unstemmed CONSTRUCTION METHOD, SCHEDULE, AND COST ESTIMATION PLANNING IN CONSTRUCTION OF FOOTBALL STADIUM PERSIBA BALIKPAPAN
title_sort construction method, schedule, and cost estimation planning in construction of football stadium persiba balikpapan
url https://digilib.itb.ac.id/gdl/view/30569
_version_ 1822923313700143104