#TITLE_ALTERNATIVE#

<p align="justify">In order to achieve the universal targets “100 – 0 – 100”, then it is considered a necessity to study the centralized wastewater management system. One of the location needs to optimize the environmental sanitation infrastructure is Tanah Tinggi WWTP in...

Full description

Saved in:
Bibliographic Details
Main Author: ROKHMAT OKTORA PUTRA (NIM : 25713308), RIZKI
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30595
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:30595
spelling id-itb.:305952018-07-24T13:57:31Z#TITLE_ALTERNATIVE# ROKHMAT OKTORA PUTRA (NIM : 25713308), RIZKI Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/30595 <p align="justify">In order to achieve the universal targets “100 – 0 – 100”, then it is considered a necessity to study the centralized wastewater management system. One of the location needs to optimize the environmental sanitation infrastructure is Tanah Tinggi WWTP in Tangerang City. The design capacity of the Waste Water Treatment Plant (WWTP) is able to accommodate domestic waste water up to 5,500 m3/day equal to 9,167 House Connections (HC), and Department of Human Settlements and <br /> <br /> Spatial Planning of Tangerang City mentioned that until recent there has been 2,758 HC in the District of Tangerang (Sukasari and Babakan sub-district) that is <br /> <br /> connected to Tanah Tinggi Waste Water Treatment Plant (WWTP). It means there is an idle capacity up to 3.845 m3/day equal to 6.409 HC (69.91%). There for it’s necessary to accelerate the development of wastewater piping network by defining the influenced development factors. The objective of this research is to identifying <br /> <br /> technical and non-technical factors of piping network development constraints of its Tanah Tinggi WWTP using Analytical Hierarchy Process (AHP) method. Based on <br /> <br /> AHP method, development constraint factors of piping networks is institutional aspect (presence of responsible institution/legal entity), and respectively are regulation & policy aspect (improvement on regulation/legal), social aspect (community sanitation behavior change), financial aspect (community’s ability and willingness to pay), and technical aspect (ease of operation & maintenance). The main measures to overcome the pipeline development constraint is the establishment of WWTP technical unit (UPTD) and also the improvement of Tangerang city <br /> <br /> regulation to support centralized wastewater management system through piping network.<p align="justify"> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">In order to achieve the universal targets “100 – 0 – 100”, then it is considered a necessity to study the centralized wastewater management system. One of the location needs to optimize the environmental sanitation infrastructure is Tanah Tinggi WWTP in Tangerang City. The design capacity of the Waste Water Treatment Plant (WWTP) is able to accommodate domestic waste water up to 5,500 m3/day equal to 9,167 House Connections (HC), and Department of Human Settlements and <br /> <br /> Spatial Planning of Tangerang City mentioned that until recent there has been 2,758 HC in the District of Tangerang (Sukasari and Babakan sub-district) that is <br /> <br /> connected to Tanah Tinggi Waste Water Treatment Plant (WWTP). It means there is an idle capacity up to 3.845 m3/day equal to 6.409 HC (69.91%). There for it’s necessary to accelerate the development of wastewater piping network by defining the influenced development factors. The objective of this research is to identifying <br /> <br /> technical and non-technical factors of piping network development constraints of its Tanah Tinggi WWTP using Analytical Hierarchy Process (AHP) method. Based on <br /> <br /> AHP method, development constraint factors of piping networks is institutional aspect (presence of responsible institution/legal entity), and respectively are regulation & policy aspect (improvement on regulation/legal), social aspect (community sanitation behavior change), financial aspect (community’s ability and willingness to pay), and technical aspect (ease of operation & maintenance). The main measures to overcome the pipeline development constraint is the establishment of WWTP technical unit (UPTD) and also the improvement of Tangerang city <br /> <br /> regulation to support centralized wastewater management system through piping network.<p align="justify">
format Theses
author ROKHMAT OKTORA PUTRA (NIM : 25713308), RIZKI
spellingShingle ROKHMAT OKTORA PUTRA (NIM : 25713308), RIZKI
#TITLE_ALTERNATIVE#
author_facet ROKHMAT OKTORA PUTRA (NIM : 25713308), RIZKI
author_sort ROKHMAT OKTORA PUTRA (NIM : 25713308), RIZKI
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/30595
_version_ 1822267503957508096