ABSTRACT DESIGN OF TERMINAL FOUNDATION AND SOIL IMPROVEMENT WITH PRELOADING AND PREFABRICATED VERTICAL DRAIN METHODS AT AIRSIDE FACILITIES OF SULTAN THAHA JAMBI AIRPORT

<p align="justify"> The working load of the runway, taxiway and apron is 15 kN/m2 and 14 kN/ m2 pavement load for runway and taxiway, while for apron is 11 kN/m2 . Other than that, the construction needs embankment to reach the required elevation +1.0 m. This construction will be bui...

Full description

Saved in:
Bibliographic Details
Main Author: ANDINI PUTRI (NIM : 15014066), RIZKY
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30608
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia