ABSTRACT DESIGN OF TERMINAL FOUNDATION AND SOIL IMPROVEMENT WITH PRELOADING AND PREFABRICATED VERTICAL DRAIN METHODS AT AIRSIDE FACILITIES OF SULTAN THAHA JAMBI AIRPORT
<p align="justify"> The working load of the runway, taxiway and apron is 15 kN/m2 and 14 kN/ m2 pavement load for runway and taxiway, while for apron is 11 kN/m2 . Other than that, the construction needs embankment to reach the required elevation +1.0 m. This construction will be bui...