#TITLE_ALTERNATIVE#
To calculate the Initial Gas In Place (IGIP) using P/Z method, production and reservoir pressure data are needed to do the analysis, whereas reservoir pressure data usually not measured regularly from time to time, meantime data that always available in the field is well head pressure data. This met...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/30786 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |