DESIGN OF HEADTANK, PENSTOCK, AND TAILRACE OF MINI HYDRO IN WAY RUHU RIVER, AMBON CITY
<p align="justify"> <br /> <br /> Population growth over time demands an increasing demand. Especially supported by rapid technological developments, electricity becomes one of the needs that are needed. The existence of electricity itself has become important for the pop...
Saved in:
Main Author: | HELENA ABIGHAIL (NIM : 15814003), SARAH |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/30819 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DAM, INTAKE, SANDTRAP & HEADRACE OF MICRO HYDRO POWER PLANT DESIGN IN WAY RUHU RIVER AMBON CITY
by: ALANIRI (NIM : 15813001), YUSANUARI -
Design of Penstock and Gate for Mini Hydro Power Plant With Capacity 10 MW.
by: Kurnia Halim, Peter -
FOREBAY, PENSTOCK, POWER HOUSE, AND TAILRACE PLANNING IN CIROMPANG MINIHYDRO POWER PLANT, CIHIKEU, DISTRICT BUNGBULANG, GARUT REGENCY, WEST JAVA
by: ZAKIYAH (NIM : 15813028), ANNISA -
Penstock Pipe Design for Perian Micro Hydro Power Plan
by: Arisyadi, Delfi -
PENSTOCK PIPE DIMENSION DESIGN CASE STUDY : PENSTOCK PIPE FOR KAMBANGAN 5 MW MINI HYDROPOWER.
by: Ikbar Wiranto, Wisnu