PORT OPERATION AND MANAGEMENT DESIGN OF PATIMBAN PORT FIRST STAGE CONTAINER TERMINAL, SUBANG REGENCY, WEST JAVA PROVINCE

<p align="justify">Patimban Port is one of the port projects by the government which construction begin in 2017. The port is located in Patimban Village, Pusakanegara District, Subang Regency, West Java Province with the aim to reduce logistics costs, to ease the land traffic congest...

Full description

Saved in:
Bibliographic Details
Main Author: Alviandi (15514060), Senna
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30875
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:30875
spelling id-itb.:308752018-10-01T08:52:14ZPORT OPERATION AND MANAGEMENT DESIGN OF PATIMBAN PORT FIRST STAGE CONTAINER TERMINAL, SUBANG REGENCY, WEST JAVA PROVINCE Alviandi (15514060), Senna Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/30875 <p align="justify">Patimban Port is one of the port projects by the government which construction begin in 2017. The port is located in Patimban Village, Pusakanegara District, Subang Regency, West Java Province with the aim to reduce logistics costs, to ease the land traffic congestion in DKI Jakarta, and strengthen economic resilience. In order for port activities to run optimally, it is necessary to implement a good port operation and management. Therefore, this Final Project will discuss about the Operational and Management Design of Patimban Port First Stage Container Terminals. The operation design is based on container demand in the year of port operation. The discussion of this Final Project includes wharf operation design, container yard operation design, and calculation of capital cost and container handling tariff. The wharf operation design includes determining the type of berthing ship; determination of type, quantity and productivity of handling equipment; and determining the dimensions of the wharf. The container yard operation design includes determining the type, quantity, and productivity of handling equipment; horizontal transport operation design; and calculation of container yard capacity. Calculation of capital cost and container handling tariff includes the calculation of the total capital cost; calculation of total expenditure and the needed for annual income during the payback period; and determination of container handling tariff.<p align="justify"> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Patimban Port is one of the port projects by the government which construction begin in 2017. The port is located in Patimban Village, Pusakanegara District, Subang Regency, West Java Province with the aim to reduce logistics costs, to ease the land traffic congestion in DKI Jakarta, and strengthen economic resilience. In order for port activities to run optimally, it is necessary to implement a good port operation and management. Therefore, this Final Project will discuss about the Operational and Management Design of Patimban Port First Stage Container Terminals. The operation design is based on container demand in the year of port operation. The discussion of this Final Project includes wharf operation design, container yard operation design, and calculation of capital cost and container handling tariff. The wharf operation design includes determining the type of berthing ship; determination of type, quantity and productivity of handling equipment; and determining the dimensions of the wharf. The container yard operation design includes determining the type, quantity, and productivity of handling equipment; horizontal transport operation design; and calculation of container yard capacity. Calculation of capital cost and container handling tariff includes the calculation of the total capital cost; calculation of total expenditure and the needed for annual income during the payback period; and determination of container handling tariff.<p align="justify">
format Final Project
author Alviandi (15514060), Senna
spellingShingle Alviandi (15514060), Senna
PORT OPERATION AND MANAGEMENT DESIGN OF PATIMBAN PORT FIRST STAGE CONTAINER TERMINAL, SUBANG REGENCY, WEST JAVA PROVINCE
author_facet Alviandi (15514060), Senna
author_sort Alviandi (15514060), Senna
title PORT OPERATION AND MANAGEMENT DESIGN OF PATIMBAN PORT FIRST STAGE CONTAINER TERMINAL, SUBANG REGENCY, WEST JAVA PROVINCE
title_short PORT OPERATION AND MANAGEMENT DESIGN OF PATIMBAN PORT FIRST STAGE CONTAINER TERMINAL, SUBANG REGENCY, WEST JAVA PROVINCE
title_full PORT OPERATION AND MANAGEMENT DESIGN OF PATIMBAN PORT FIRST STAGE CONTAINER TERMINAL, SUBANG REGENCY, WEST JAVA PROVINCE
title_fullStr PORT OPERATION AND MANAGEMENT DESIGN OF PATIMBAN PORT FIRST STAGE CONTAINER TERMINAL, SUBANG REGENCY, WEST JAVA PROVINCE
title_full_unstemmed PORT OPERATION AND MANAGEMENT DESIGN OF PATIMBAN PORT FIRST STAGE CONTAINER TERMINAL, SUBANG REGENCY, WEST JAVA PROVINCE
title_sort port operation and management design of patimban port first stage container terminal, subang regency, west java province
url https://digilib.itb.ac.id/gdl/view/30875
_version_ 1821995890939789312