REKALIBRASI LENGKUNG DEBIT (RATING CURVE) DI POS MONJOT UNTUK MASUKAN OPERASI BENDUNG GERAK RENTANG
<b>ABSTRACT:</b><br> <br /> <br /> Operating gate of Rentang Weirs based upon discharge volume which followed from upstream (Mot fat station) to necessity irrigation water for I hree regency : Majalengka, lndramayu, and Cirebon regency. As for quantity of Motif at di...
Saved in:
Main Author: | A. Mucharam, R. |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/3096 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Tinjauan hidraulik kinerja operasi pintu bendung gerak Serayu Gambarsari dalam menunjang upaya penanggulangan banjir dan irigasi
by: , SUHARDJO, Imam, et al.
Published: (2010) -
Model optimasi pengelolaan air intake lakbok selatan bendung gerak Manganti
by: , HIDAYAT, Asep Kurnia, et al.
Published: (2001) -
MODEL LENGKUNG BENTUK BATANG (TAPER CURVE) POHON JATI (Tectonagrandis)
by: Perpustakaan UGM, i-lib
Published: (2009) -
EFEK PEMBERIAN GLUTAMIN TERHADAP KEKUATAN OTOT DAN RENTANG GERAK SENDI (RANGE OF MOTION) SETELAH AKTIVITAS EKSENTRIK
by: Agus Suryadi, NIM011214553011
Published: (2014) -
Analisis pemanfaatan sumberdaya air dalam rangka pengembangan wilayah Bendung Gerak Serayu sebagai kawasan wisata
by: , BARKAH, Atiyah, et al.
Published: (2001)