UPRATING WARUNGKIARA-CIKEMBAR WATER TREATMENT PLANT AT SUKABUMI REGENCY

Tirta Jaya Mandiri Water Supply Company (PDAM) is a company engaged in the provision of drinking water services. PDAM Tirta Jaya Mandiri has 21 branches of Drinking Water Treatment Plant spread over Sukabumi regency. Warungkiara-Cikembar Water Treatment Plant (WTP) is one of the WTP that operates in...

Full description

Saved in:
Bibliographic Details
Main Author: FATIMAH (NIM : 15314029), SITI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30988
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:30988
spelling id-itb.:309882018-06-28T13:16:45ZUPRATING WARUNGKIARA-CIKEMBAR WATER TREATMENT PLANT AT SUKABUMI REGENCY FATIMAH (NIM : 15314029), SITI Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/30988 Tirta Jaya Mandiri Water Supply Company (PDAM) is a company engaged in the provision of drinking water services. PDAM Tirta Jaya Mandiri has 21 branches of Drinking Water Treatment Plant spread over Sukabumi regency. Warungkiara-Cikembar Water Treatment Plant (WTP) is one of the WTP that operates in the service of PDAM Tirta Jaya Mandiri. Warungkiara-Cikembar has a production capacity of 40 L/s. Increasing public demand of Cikembar subdistrics for clean water makes the capacity of Warungkiara-Cikembar WTP needs to be increased. The objectives of this final project is to evaluate and redesign the coagulation, flocculation, sedimentation, and filtration unit to increase clean water treatment capacity at Warungkiara-Cikembar WTP. Raw water is taken from the river Cicatih. Then the raw water into the first unit is coagulation to add PAC (Poly Aluminum Chloride). Furthermore, raw water enters the flocculation unit with slow mixing process. Then the colloid particles in the water will be settled on the sedimentation unit and the water is filtered. The clean water to be produced by Warungkiara-Cikembar water treatment plant to meet service target in 2028 is 80 L/s. To meet these targets, Warungkiara-Cikembar water treatment plant has to be redesigned by also considering compliance with the design criteria of SNI 6774: 2008 and Kawamura (1991). The existing flocculation unit of the Warungkiara-Cikembar WTP can still meet the design criteria to process the target discharge, but the existing coagulation, sedimentation and filtration units are unable to process the target rate. The suggested design is the addition of one coagulation unit with a static mixer type, two sedimentation units adapted to the existing condition of 5,1 x 3 x 3,75 m, and two filtration unit compartments which each compartment contains 5 of filter cell with size 1,39 x 1,39 m. The cost are required for uprating Warungkiara-Cikembar WTP is Rp1.551.100.000,00 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Tirta Jaya Mandiri Water Supply Company (PDAM) is a company engaged in the provision of drinking water services. PDAM Tirta Jaya Mandiri has 21 branches of Drinking Water Treatment Plant spread over Sukabumi regency. Warungkiara-Cikembar Water Treatment Plant (WTP) is one of the WTP that operates in the service of PDAM Tirta Jaya Mandiri. Warungkiara-Cikembar has a production capacity of 40 L/s. Increasing public demand of Cikembar subdistrics for clean water makes the capacity of Warungkiara-Cikembar WTP needs to be increased. The objectives of this final project is to evaluate and redesign the coagulation, flocculation, sedimentation, and filtration unit to increase clean water treatment capacity at Warungkiara-Cikembar WTP. Raw water is taken from the river Cicatih. Then the raw water into the first unit is coagulation to add PAC (Poly Aluminum Chloride). Furthermore, raw water enters the flocculation unit with slow mixing process. Then the colloid particles in the water will be settled on the sedimentation unit and the water is filtered. The clean water to be produced by Warungkiara-Cikembar water treatment plant to meet service target in 2028 is 80 L/s. To meet these targets, Warungkiara-Cikembar water treatment plant has to be redesigned by also considering compliance with the design criteria of SNI 6774: 2008 and Kawamura (1991). The existing flocculation unit of the Warungkiara-Cikembar WTP can still meet the design criteria to process the target discharge, but the existing coagulation, sedimentation and filtration units are unable to process the target rate. The suggested design is the addition of one coagulation unit with a static mixer type, two sedimentation units adapted to the existing condition of 5,1 x 3 x 3,75 m, and two filtration unit compartments which each compartment contains 5 of filter cell with size 1,39 x 1,39 m. The cost are required for uprating Warungkiara-Cikembar WTP is Rp1.551.100.000,00
format Final Project
author FATIMAH (NIM : 15314029), SITI
spellingShingle FATIMAH (NIM : 15314029), SITI
UPRATING WARUNGKIARA-CIKEMBAR WATER TREATMENT PLANT AT SUKABUMI REGENCY
author_facet FATIMAH (NIM : 15314029), SITI
author_sort FATIMAH (NIM : 15314029), SITI
title UPRATING WARUNGKIARA-CIKEMBAR WATER TREATMENT PLANT AT SUKABUMI REGENCY
title_short UPRATING WARUNGKIARA-CIKEMBAR WATER TREATMENT PLANT AT SUKABUMI REGENCY
title_full UPRATING WARUNGKIARA-CIKEMBAR WATER TREATMENT PLANT AT SUKABUMI REGENCY
title_fullStr UPRATING WARUNGKIARA-CIKEMBAR WATER TREATMENT PLANT AT SUKABUMI REGENCY
title_full_unstemmed UPRATING WARUNGKIARA-CIKEMBAR WATER TREATMENT PLANT AT SUKABUMI REGENCY
title_sort uprating warungkiara-cikembar water treatment plant at sukabumi regency
url https://digilib.itb.ac.id/gdl/view/30988
_version_ 1821995930165968896