Water Level Data Acquisition System Using Ultrasonic Waves Based On Internet of Things for Open Channel Flow Rate Prediction

<p align="justify">Micro Hydro Power (MHP) Plant is a hydro power plant with a scale of 5 - 100 kW. Prior to installation of the plant, it is necessary to conduct a hydrological survey to obtain the river flow rate within a certain period of time which is generally a year. Variations...

Full description

Saved in:
Bibliographic Details
Main Author: HARDI (NIM : 13313087) - NIZAR GHOZALI (NIM : 13313094), VIANKA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/31470
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia