Water Level Data Acquisition System Using Ultrasonic Waves Based On Internet of Things for Open Channel Flow Rate Prediction
<p align="justify">Micro Hydro Power (MHP) Plant is a hydro power plant with a scale of 5 - 100 kW. Prior to installation of the plant, it is necessary to conduct a hydrological survey to obtain the river flow rate within a certain period of time which is generally a year. Variations...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/31470 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!