PENGEMBANGAN MODEL PEMILIHAN MITRA PEMASOK PADA PROYEK KONSTRUKSI

Construction project is a simultaneous package of activity constrained by cost, quality, and time. This kind of project requires a variety of resources, such as man, materials, machine, and methods. The influence of physical and non-physical environment in construction project caused the fluctuation...

Full description

Saved in:
Bibliographic Details
Main Author: Sychroni, Syadaruddin
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/3166
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:3166
spelling id-itb.:31662005-05-12T11:10:04ZPENGEMBANGAN MODEL PEMILIHAN MITRA PEMASOK PADA PROYEK KONSTRUKSI Sychroni, Syadaruddin Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Theses construction project, supplier, partnership, AHP method, DEA approach) INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/3166 Construction project is a simultaneous package of activity constrained by cost, quality, and time. This kind of project requires a variety of resources, such as man, materials, machine, and methods. The influence of physical and non-physical environment in construction project caused the fluctuation of its productivity. As a consequence, the changes in schedule and scope of works are common occurrence in construction project, even on a well-run project. In the current practice, the transactional relationship between contractor and supplier has limiting the supplier role in the achievement of project goal. According to the supply chain approach, productivity can be improved by strengthening the production unit, which are contractor and supplier in term of construction project. Integrated relation between contractor and supplier ensure that the changes of schedule and volume in material procurement will not disturbing the overall target of project completion. Partnership is one of many ways to integrate the contractor and supplier. This research will develop a supplier-as-partner selection model in construction project considering the negotiation aspect. The selection system will apply the AHP and scoring method for the assessment model and DEA approach in negotiation phase. The final model is a general model with no relation to a certain kind of material. The model consists of a selection procedure, appraisal system, negotiation method, and the partnership organization text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Sychroni, Syadaruddin
PENGEMBANGAN MODEL PEMILIHAN MITRA PEMASOK PADA PROYEK KONSTRUKSI
description Construction project is a simultaneous package of activity constrained by cost, quality, and time. This kind of project requires a variety of resources, such as man, materials, machine, and methods. The influence of physical and non-physical environment in construction project caused the fluctuation of its productivity. As a consequence, the changes in schedule and scope of works are common occurrence in construction project, even on a well-run project. In the current practice, the transactional relationship between contractor and supplier has limiting the supplier role in the achievement of project goal. According to the supply chain approach, productivity can be improved by strengthening the production unit, which are contractor and supplier in term of construction project. Integrated relation between contractor and supplier ensure that the changes of schedule and volume in material procurement will not disturbing the overall target of project completion. Partnership is one of many ways to integrate the contractor and supplier. This research will develop a supplier-as-partner selection model in construction project considering the negotiation aspect. The selection system will apply the AHP and scoring method for the assessment model and DEA approach in negotiation phase. The final model is a general model with no relation to a certain kind of material. The model consists of a selection procedure, appraisal system, negotiation method, and the partnership organization
format Theses
author Sychroni, Syadaruddin
author_facet Sychroni, Syadaruddin
author_sort Sychroni, Syadaruddin
title PENGEMBANGAN MODEL PEMILIHAN MITRA PEMASOK PADA PROYEK KONSTRUKSI
title_short PENGEMBANGAN MODEL PEMILIHAN MITRA PEMASOK PADA PROYEK KONSTRUKSI
title_full PENGEMBANGAN MODEL PEMILIHAN MITRA PEMASOK PADA PROYEK KONSTRUKSI
title_fullStr PENGEMBANGAN MODEL PEMILIHAN MITRA PEMASOK PADA PROYEK KONSTRUKSI
title_full_unstemmed PENGEMBANGAN MODEL PEMILIHAN MITRA PEMASOK PADA PROYEK KONSTRUKSI
title_sort pengembangan model pemilihan mitra pemasok pada proyek konstruksi
url https://digilib.itb.ac.id/gdl/view/3166
_version_ 1820663364345397248