PROPOSED ACTION FOR EFFECTIVENESS IMPROVEMENT OF NEW TIRE DEVELOPMENT PROJECT AT ABC COMPANY

ABC is one of expanding tire manufacturers located in Indonesia. With large opportunity in tire market and access to raw material in Indonesia, ABC has expanding business. Its production capacity is increasing continuously to meet tire market demand. Enormous production capacity surely needs to be u...

Full description

Saved in:
Bibliographic Details
Main Author: Arif Rahman Hakim - 29114581, Zainal
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/31880
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:31880
spelling id-itb.:318802018-03-19T08:02:49ZPROPOSED ACTION FOR EFFECTIVENESS IMPROVEMENT OF NEW TIRE DEVELOPMENT PROJECT AT ABC COMPANY Arif Rahman Hakim - 29114581, Zainal Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/31880 ABC is one of expanding tire manufacturers located in Indonesia. With large opportunity in tire market and access to raw material in Indonesia, ABC has expanding business. Its production capacity is increasing continuously to meet tire market demand. Enormous production capacity surely needs to be utilized effectively so that its products can be absorbed by market. Right product for right consumer is the key. Right product is generated in New Tire Development Project (NTDP) stage before entering mass production. This thesis will be focused on improving current NTDP process at PT ABC <br /> <br /> The identified issue in the project is its production trial ineffectiveness. There are three aspects that lead to this ineffectiveness. First is excessive number of production trial which directly impact to longer project lead time and higher cost. Second is lack of project monitoring by chief engineer (CE). The effect is action cannot be quickly taken for problem arisen because CE late to found the problem or abnormalities. Third is small utilization of existing tire components. Small utilization means that there will always new component for new tire although tire with same size is already developed before. This phenomenon in the future will make production shop floor very complicated due to number of components they must handle. <br /> <br /> The root causes are lack of engineer skill, failure analysis is not considering factor other than tire construction, manual paper based project tracking, and previous project development history is not stored centrally. <br /> <br /> Proposed business solutions are skill mapping and training for engineer, modify trial production flow process, and utilization of project tracking and product data management platform text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description ABC is one of expanding tire manufacturers located in Indonesia. With large opportunity in tire market and access to raw material in Indonesia, ABC has expanding business. Its production capacity is increasing continuously to meet tire market demand. Enormous production capacity surely needs to be utilized effectively so that its products can be absorbed by market. Right product for right consumer is the key. Right product is generated in New Tire Development Project (NTDP) stage before entering mass production. This thesis will be focused on improving current NTDP process at PT ABC <br /> <br /> The identified issue in the project is its production trial ineffectiveness. There are three aspects that lead to this ineffectiveness. First is excessive number of production trial which directly impact to longer project lead time and higher cost. Second is lack of project monitoring by chief engineer (CE). The effect is action cannot be quickly taken for problem arisen because CE late to found the problem or abnormalities. Third is small utilization of existing tire components. Small utilization means that there will always new component for new tire although tire with same size is already developed before. This phenomenon in the future will make production shop floor very complicated due to number of components they must handle. <br /> <br /> The root causes are lack of engineer skill, failure analysis is not considering factor other than tire construction, manual paper based project tracking, and previous project development history is not stored centrally. <br /> <br /> Proposed business solutions are skill mapping and training for engineer, modify trial production flow process, and utilization of project tracking and product data management platform
format Theses
author Arif Rahman Hakim - 29114581, Zainal
spellingShingle Arif Rahman Hakim - 29114581, Zainal
PROPOSED ACTION FOR EFFECTIVENESS IMPROVEMENT OF NEW TIRE DEVELOPMENT PROJECT AT ABC COMPANY
author_facet Arif Rahman Hakim - 29114581, Zainal
author_sort Arif Rahman Hakim - 29114581, Zainal
title PROPOSED ACTION FOR EFFECTIVENESS IMPROVEMENT OF NEW TIRE DEVELOPMENT PROJECT AT ABC COMPANY
title_short PROPOSED ACTION FOR EFFECTIVENESS IMPROVEMENT OF NEW TIRE DEVELOPMENT PROJECT AT ABC COMPANY
title_full PROPOSED ACTION FOR EFFECTIVENESS IMPROVEMENT OF NEW TIRE DEVELOPMENT PROJECT AT ABC COMPANY
title_fullStr PROPOSED ACTION FOR EFFECTIVENESS IMPROVEMENT OF NEW TIRE DEVELOPMENT PROJECT AT ABC COMPANY
title_full_unstemmed PROPOSED ACTION FOR EFFECTIVENESS IMPROVEMENT OF NEW TIRE DEVELOPMENT PROJECT AT ABC COMPANY
title_sort proposed action for effectiveness improvement of new tire development project at abc company
url https://digilib.itb.ac.id/gdl/view/31880
_version_ 1822923726239301632