STOPE STABILITY AND SUPPORT DESIGN ANALYSIS ON SQUEEZING ROCK IN STOPE XC 662 CIURUG LEVEL 600 PT ANTAM UBPE PONGKOR
Underground mining will always faced with problems of deformation and rock mass instability around tunnels. PT. Antam conducted underground mining activities in Pongkor, Bogor which faced squeezing rock problems on its production stopes, Stope XC 662 Ciurug. <br /> <br /> Squeezing is a...
Saved in:
Main Author: | Rizqy Hafizh Banjaransari (NIM : 22117030), Zulnio |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/31927 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STABILITY ANALYSIS AND SUPPORT RECOMMENDATIONS IN THE WEAK ROCK AT CROSS CUT XC 662 CIURUG PT ANTAM UBPE PONGKOR
by: Cahyaningsih, Bimbi -
STOPE STABILITY ANALYSIS ON SQUEEZING ROCKMASS WITH THREE DIMENSIONAL FINITE ELEMENT MODELING OF PT ANTAM TBK UBPE PONGKOR UNDERGROUND GOLD MINE
by: Yudha, Wira -
STOPE GEOMETRY OPTIMIZATION IN VEIN DEPOSIT USING HEURISTIC ALGORITHM WHICH CONSIDERED GEOMECHANICAL PARAMETERS (CASE STUDY: UBPE ANTAM PONGKOR)
by: Putra, Danu -
OPTIMATION STUDY OF BLASTING PATTERN TO INCREASE THE ADVANCE OF BLASTING AT RAMP DOWN CENTRAL, CIURUG LEVEL 500, PT ANTAM UBPE PONGKOR
by: ISMI (NIM : 12105003); Pembimbing : Dr. Ir. Suseno Kramadibrata, M.Sc; Dr. Ganda Marihot Siman, FARIZ -
SILL PILLAR STABILITY ANALYSIS BASED ON DISCONTINUITY PLANE IN CROSSCUT 10.4 SOUTH CIURUG UNDERGROUND MINE, UBPE PONGKOR PT. ANTAM Tbk.
by: PUTRA ADHI LAKSANA (NIM : 12106014); Pembimbing : Dr. Ir. Budi Sulistianto, MT., M.