PENGEMBANGAN BOUNDARY PARTNERS PENGAWASAN PEMBANGUNAN INFRASTRUKTUR BIDANG BINA MARGA: PENDEKATAN OUTCOME MAPPING
This thesis discusses how to develop boundary partners audit program of Inspectorate General of Ministry of Public Works and Public Housing (PUPR) at National Road Implementation Center VI (BBPJN VI). The development of national roads is one part of infrastructure development that supports nation...
Saved in:
Main Author: | Handayani, Desy |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/33445 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DEVELOPING BOUNDARY PARTNERS IN SURVEILLANCE OF CONSTRUCTION INFRASTRUCTURE DEVELOPMENT: OUTCOME MAPPING APPROACH
by: Handayani NIM: 24015311, Desy -
Analisis depresiasi aset infrastruktur jalan menggunakan metode Bina Marga untuk penetapan nilai wajar :: Studi pada Kabupaten Mimika tahun 2008
by: , KUAHATY, Nicolaas Evert, et al.
Published: (2008) -
Kajian sifat marshall dan angka poisson campuran beton aspal diameter max 25 mm spesifikasi bina marga 1987 dan bina marga 1998
by: , WIDIDHARMA, Paulus, et al.
Published: (2002) -
COMPARISON BETWEEN THE BINA MARGA METHOD AND THE 1986 AASHTO METHOD FOR FLEXIBLE PAVEMENT
by: Ghofar Ismail (NIM 26989016), Achmad -
Aplikasi standar analisis belanja pada Sub DInas Bina Marga Kabupaten Pemalang
by: , WIBISONO, Gunawan, et al.
Published: (2001)