Study of Potential of Sea Current Generated Power at Tanjung Pelanduk, Kepulauan Riau Province

Fullfilment of electricity in Indonesia is still minimal especially at remote areas.. One of the resource that can be used as an electricity source that haven’t been cultivated is sea current which is also a renewable energy source and is one of the easiest source to cultivate as Indonesia was made...

Full description

Saved in:
Bibliographic Details
Main Author: Brahmaputra, Gandewa
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/33541
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:33541
spelling id-itb.:335412019-01-24T13:29:04ZStudy of Potential of Sea Current Generated Power at Tanjung Pelanduk, Kepulauan Riau Province Brahmaputra, Gandewa Indonesia Final Project Modeling Hydrodynamics, Tidal Current, Renewable Energy, Delft3D, Tanjung Pelanduk. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/33541 Fullfilment of electricity in Indonesia is still minimal especially at remote areas.. One of the resource that can be used as an electricity source that haven’t been cultivated is sea current which is also a renewable energy source and is one of the easiest source to cultivate as Indonesia was made of thousands of islands and consist mostly of water body. The purpose of this final assignment is to analyse the potential power produced by using sea currents within waters surounding Combol Island where the fullfilment of their electricity necessities is still not enough. Moreover, a financial analysis will be done to determine a selling price. This study was done by making a 3D hydrodynamics model using Delft3D software. The differentiation of the model and survey water elevation was as the following; 9.42% for the large region model, and 9.41% for the small region. The current speed error for the small region is 12.31% but since the phase of both data is quite similar, the model is still valid. From the small region model, several locations with high current speed was chosen as potential locations. On those locations, 75 GHT instruments will be planted which is projected to produce 857,629.37 kWh yearly. The cost needed for this project is Rp13,510,693,200.00 with extra yearly cost Rp670,021,875.00 as an operational and maintenance cost. By targeting for a breakeven point at the 25th year, it was determined that the selling price to reach that target is Rp 2755 per kWh. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Fullfilment of electricity in Indonesia is still minimal especially at remote areas.. One of the resource that can be used as an electricity source that haven’t been cultivated is sea current which is also a renewable energy source and is one of the easiest source to cultivate as Indonesia was made of thousands of islands and consist mostly of water body. The purpose of this final assignment is to analyse the potential power produced by using sea currents within waters surounding Combol Island where the fullfilment of their electricity necessities is still not enough. Moreover, a financial analysis will be done to determine a selling price. This study was done by making a 3D hydrodynamics model using Delft3D software. The differentiation of the model and survey water elevation was as the following; 9.42% for the large region model, and 9.41% for the small region. The current speed error for the small region is 12.31% but since the phase of both data is quite similar, the model is still valid. From the small region model, several locations with high current speed was chosen as potential locations. On those locations, 75 GHT instruments will be planted which is projected to produce 857,629.37 kWh yearly. The cost needed for this project is Rp13,510,693,200.00 with extra yearly cost Rp670,021,875.00 as an operational and maintenance cost. By targeting for a breakeven point at the 25th year, it was determined that the selling price to reach that target is Rp 2755 per kWh.
format Final Project
author Brahmaputra, Gandewa
spellingShingle Brahmaputra, Gandewa
Study of Potential of Sea Current Generated Power at Tanjung Pelanduk, Kepulauan Riau Province
author_facet Brahmaputra, Gandewa
author_sort Brahmaputra, Gandewa
title Study of Potential of Sea Current Generated Power at Tanjung Pelanduk, Kepulauan Riau Province
title_short Study of Potential of Sea Current Generated Power at Tanjung Pelanduk, Kepulauan Riau Province
title_full Study of Potential of Sea Current Generated Power at Tanjung Pelanduk, Kepulauan Riau Province
title_fullStr Study of Potential of Sea Current Generated Power at Tanjung Pelanduk, Kepulauan Riau Province
title_full_unstemmed Study of Potential of Sea Current Generated Power at Tanjung Pelanduk, Kepulauan Riau Province
title_sort study of potential of sea current generated power at tanjung pelanduk, kepulauan riau province
url https://digilib.itb.ac.id/gdl/view/33541
_version_ 1822268166293684224