PERHITUNGAN AWAL POTENSI CLEAN DEVELOPMENT MECHANISM PROJECT MELALUI REDUKSI EMISI DARI PENGGUNAAN ENERGI DI PT A.W. FABER-CASTELL INDONESIA
Kyoto Protocol is one of the agreement among all nations in the world, which goal is to reduce 5% of green house gases from their 1990 emission. There are 3 mechanisms to reduce the emission, which are Joint Implementation, Clean Development Mechanism, and Emission Trading. In all of these mechani...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/34938 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Kyoto Protocol is one of the agreement among all nations in the world, which goal is to reduce 5% of
green house gases from their 1990 emission. There are 3 mechanisms to reduce the emission, which are
Joint Implementation, Clean Development Mechanism, and Emission Trading. In all of these mechanisms,
mitigation of emission value is needed to know the emission reduction in the project. To mitigate the
emission value, mass balance method that sees material input flow and output material flow in the process
could be used. PT A.W. Faber-Castell Indonesia is one of international company from Germany, who
wants to participate actively in conserving their environment. Mass balance in PT A.W. Faber-Castell
Indonesia includes input material,l which is wood or leads. And the output flows are cutting wood for
shaping pencils, and pencils. The mitigation of baseline emission shows that PT A. W. Faber-Castell
Indonesia can contribute at small scale activities in CDM. The activities proposed include switching
centralized blower with small capacity blower in each line of the machine, to add or replace machineries
used in production processes , and using wood and leads powder to replace coal as fuel in power plant.
For every emission reduction alternative programs which compare between condition before and after
project give effectiveness minimum value is 0,35 maximum value is 0,50322. The third emission reduction
alternative programs cannot be used in small-scale program because the emission can not be mitigated
and limitation of data. Result from calculating the third proposed activity could only be shown when
adding new machine, without reducing the use of operational and maintenance facilities, but at the
capacity, because new machines give larger capacity value almost twice than the old ones. |
---|