PERENCANAAN PENGEMBANGAN INSTALASI PENGOLAHAN AIR LIMBAH INDUSTRI PUPUK DI BONTANG, KALIMANTAN TIMUR

Fertilizer has an important part in agricultural and plantation sector especially in agricultural country like Indonesia. In production process, fertilizer industries in Bontang, East Kalimantan use water in gross amount which can reach 457.200 m3/day for each plant. The wastewater sources are sh...

Full description

Saved in:
Bibliographic Details
Main Author: SURYA, LIZA
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/34978
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:34978
spelling id-itb.:349782019-02-18T14:48:51ZPERENCANAAN PENGEMBANGAN INSTALASI PENGOLAHAN AIR LIMBAH INDUSTRI PUPUK DI BONTANG, KALIMANTAN TIMUR SURYA, LIZA Administrasi negara bidang ekonomi & lingkungan Indonesia Final Project WWTP, fertilizer industries, ammonia stripper, aerated pond INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/34978 Fertilizer has an important part in agricultural and plantation sector especially in agricultural country like Indonesia. In production process, fertilizer industries in Bontang, East Kalimantan use water in gross amount which can reach 457.200 m3/day for each plant. The wastewater sources are shut down of plant, turn around of plant and pump drains. Ammonia, BOD and COD are the major components from the wastewater so that wastewater requires being treat specifically before comes in to environment or the body stream. Processing intended to reduce loads that received by the body stream, meanwhile that body stream has limited capacity of self-purification. Wastewater treatment expansion for this fertilizer industry in Bontang, East Kalimantan needed because the effectiveness and capacities of this wastewater treatment is not suit enough for industrial capacities in this present day. This expansion planned to have 5 years period of service. Based on the wastewater characteristic hence the expand alternative of this wastewater treatment are Nitrification/Denitrification biological process and combination of Ammonia Stripper-Aerated Pond. The recommend expand alternative to be applied is combination of Ammonia Stripper- Aerated Pond. The selection based on the technical consideration using Coefficient of Important Factor method and economic consideration based on cost analysis for each alternative. The units on this WWTP consist of: Equalization Basin, pH Adjustment Tank, Ammonia Stripper, Neutralization Tank, Effluent Tank, Aerated Pond, and Sedimentation Pond. The total cost of this WWTP project based on the cost analysis is about 13 billion Rupiahs. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Administrasi negara bidang ekonomi & lingkungan
spellingShingle Administrasi negara bidang ekonomi & lingkungan
SURYA, LIZA
PERENCANAAN PENGEMBANGAN INSTALASI PENGOLAHAN AIR LIMBAH INDUSTRI PUPUK DI BONTANG, KALIMANTAN TIMUR
description Fertilizer has an important part in agricultural and plantation sector especially in agricultural country like Indonesia. In production process, fertilizer industries in Bontang, East Kalimantan use water in gross amount which can reach 457.200 m3/day for each plant. The wastewater sources are shut down of plant, turn around of plant and pump drains. Ammonia, BOD and COD are the major components from the wastewater so that wastewater requires being treat specifically before comes in to environment or the body stream. Processing intended to reduce loads that received by the body stream, meanwhile that body stream has limited capacity of self-purification. Wastewater treatment expansion for this fertilizer industry in Bontang, East Kalimantan needed because the effectiveness and capacities of this wastewater treatment is not suit enough for industrial capacities in this present day. This expansion planned to have 5 years period of service. Based on the wastewater characteristic hence the expand alternative of this wastewater treatment are Nitrification/Denitrification biological process and combination of Ammonia Stripper-Aerated Pond. The recommend expand alternative to be applied is combination of Ammonia Stripper- Aerated Pond. The selection based on the technical consideration using Coefficient of Important Factor method and economic consideration based on cost analysis for each alternative. The units on this WWTP consist of: Equalization Basin, pH Adjustment Tank, Ammonia Stripper, Neutralization Tank, Effluent Tank, Aerated Pond, and Sedimentation Pond. The total cost of this WWTP project based on the cost analysis is about 13 billion Rupiahs.
format Final Project
author SURYA, LIZA
author_facet SURYA, LIZA
author_sort SURYA, LIZA
title PERENCANAAN PENGEMBANGAN INSTALASI PENGOLAHAN AIR LIMBAH INDUSTRI PUPUK DI BONTANG, KALIMANTAN TIMUR
title_short PERENCANAAN PENGEMBANGAN INSTALASI PENGOLAHAN AIR LIMBAH INDUSTRI PUPUK DI BONTANG, KALIMANTAN TIMUR
title_full PERENCANAAN PENGEMBANGAN INSTALASI PENGOLAHAN AIR LIMBAH INDUSTRI PUPUK DI BONTANG, KALIMANTAN TIMUR
title_fullStr PERENCANAAN PENGEMBANGAN INSTALASI PENGOLAHAN AIR LIMBAH INDUSTRI PUPUK DI BONTANG, KALIMANTAN TIMUR
title_full_unstemmed PERENCANAAN PENGEMBANGAN INSTALASI PENGOLAHAN AIR LIMBAH INDUSTRI PUPUK DI BONTANG, KALIMANTAN TIMUR
title_sort perencanaan pengembangan instalasi pengolahan air limbah industri pupuk di bontang, kalimantan timur
url https://digilib.itb.ac.id/gdl/view/34978
_version_ 1822268442751795200