REDESIGN TEMPAT PENAMPUNGAN SEMENTARA (TPS) MENJADI TEMPAT PENGOLAHAN SAMPAH TERPADU (TPST) DI KOTA CIMAHI
Solid waste is one of the current problems in Cimahi. In order to solve this problem, Cimahi must be able to process their solid waste independently to decrease the solid waste transported to Sarimukti Landfill. Cimahi does not have a large enough area to built a landfill, so the alternative is buil...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/35180 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Solid waste is one of the current problems in Cimahi. In order to solve this problem, Cimahi must be able to process their solid waste independently to decrease the solid waste transported to Sarimukti Landfill. Cimahi does not have a large enough area to built a landfill, so the alternative is building a Material Recovery Facilty (MRF). According to UU No. 18/2008 article 1, Material Recovery Facility is a place for collecting, sorting, reusing, processing, and final processing the solid waste. This study aims to find the most appropiate solid waste management and will be applied in MRF later. The research was conducted in one of the selected transfer station, named Pasar Kuda Intermediate Station which will be developed as a MRF. Based on the results of solid waste sampling in the service area of Pasar Kuda Intermediate Station, the amount of solid waste produced is 0.3 kg/person/day or 2.1 liters/person/day with the composition dominated by composted organic waste (36.1%), then uncomposted organic waste (27.9%). This data would be a reference to design three alternative waste management system to be applied. By using this alternative waste processing system the number of waste generation that will sent to Sarimukti landfill can be decreased from 12,841.8 kg/day to 6,139.1 kg/day in the first day and 10,543.2 kg/day in the other six days. As for the overall development cost of the processing system, it is estimated to reach Rp 1.677.577.369,00 per year. |
---|