OPERATION STRATEGY OF NAGANAGA TO SUSTAIN ECONOMIC RETURN UNDER GROSS SPLIT PSC INCLUSION OF PI TO BUMD

The Naganaga Oil and Gas Working Area in East Kalimantan Province in 2018 was mandated by the Indonesian government to PT Minaga (MNG) with the Gross Split Production Sharing Contract scheme in accordance with MEMR Regulatory No. 8 of 2017 and changes to Gross Split Production Sharing Contracts. I...

Full description

Saved in:
Bibliographic Details
Main Author: Putro Wijayanto, Dwi
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/35766
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:35766
spelling id-itb.:357662019-03-01T11:55:15ZOPERATION STRATEGY OF NAGANAGA TO SUSTAIN ECONOMIC RETURN UNDER GROSS SPLIT PSC INCLUSION OF PI TO BUMD Putro Wijayanto, Dwi Indonesia Theses Capital Budgeting, Gross Split, Production Sharing Contract, PI BUMD INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/35766 The Naganaga Oil and Gas Working Area in East Kalimantan Province in 2018 was mandated by the Indonesian government to PT Minaga (MNG) with the Gross Split Production Sharing Contract scheme in accordance with MEMR Regulatory No. 8 of 2017 and changes to Gross Split Production Sharing Contracts. In addition, there is also an obligation for BUMD carry with 10% Participating Interest as regulated in MEMR Regulatory No. 37 of 2016 concerning Provisions for 10% Participating Interest in the Oil and Gas Working Areas. This study aims to evaluate the feasibility of Naganaga PSC from remaining reserves including PI 10% BUMD. Capital Budgeting Method with Discounted Cash Flow is used for evaluation, the results show a negative NPV value for MNG and sensitivity analysis is carried out on variable production, price and operating costs and capital costs. To provide economic value for MNG, several things need to be done, such as asking for additional splits of the contractor and efficiency of operating costs or capital costs. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The Naganaga Oil and Gas Working Area in East Kalimantan Province in 2018 was mandated by the Indonesian government to PT Minaga (MNG) with the Gross Split Production Sharing Contract scheme in accordance with MEMR Regulatory No. 8 of 2017 and changes to Gross Split Production Sharing Contracts. In addition, there is also an obligation for BUMD carry with 10% Participating Interest as regulated in MEMR Regulatory No. 37 of 2016 concerning Provisions for 10% Participating Interest in the Oil and Gas Working Areas. This study aims to evaluate the feasibility of Naganaga PSC from remaining reserves including PI 10% BUMD. Capital Budgeting Method with Discounted Cash Flow is used for evaluation, the results show a negative NPV value for MNG and sensitivity analysis is carried out on variable production, price and operating costs and capital costs. To provide economic value for MNG, several things need to be done, such as asking for additional splits of the contractor and efficiency of operating costs or capital costs.
format Theses
author Putro Wijayanto, Dwi
spellingShingle Putro Wijayanto, Dwi
OPERATION STRATEGY OF NAGANAGA TO SUSTAIN ECONOMIC RETURN UNDER GROSS SPLIT PSC INCLUSION OF PI TO BUMD
author_facet Putro Wijayanto, Dwi
author_sort Putro Wijayanto, Dwi
title OPERATION STRATEGY OF NAGANAGA TO SUSTAIN ECONOMIC RETURN UNDER GROSS SPLIT PSC INCLUSION OF PI TO BUMD
title_short OPERATION STRATEGY OF NAGANAGA TO SUSTAIN ECONOMIC RETURN UNDER GROSS SPLIT PSC INCLUSION OF PI TO BUMD
title_full OPERATION STRATEGY OF NAGANAGA TO SUSTAIN ECONOMIC RETURN UNDER GROSS SPLIT PSC INCLUSION OF PI TO BUMD
title_fullStr OPERATION STRATEGY OF NAGANAGA TO SUSTAIN ECONOMIC RETURN UNDER GROSS SPLIT PSC INCLUSION OF PI TO BUMD
title_full_unstemmed OPERATION STRATEGY OF NAGANAGA TO SUSTAIN ECONOMIC RETURN UNDER GROSS SPLIT PSC INCLUSION OF PI TO BUMD
title_sort operation strategy of naganaga to sustain economic return under gross split psc inclusion of pi to bumd
url https://digilib.itb.ac.id/gdl/view/35766
_version_ 1821996993215463424