OPERATION STRATEGY OF NAGANAGA TO SUSTAIN ECONOMIC RETURN UNDER GROSS SPLIT PSC INCLUSION OF PI TO BUMD
The Naganaga Oil and Gas Working Area in East Kalimantan Province in 2018 was mandated by the Indonesian government to PT Minaga (MNG) with the Gross Split Production Sharing Contract scheme in accordance with MEMR Regulatory No. 8 of 2017 and changes to Gross Split Production Sharing Contracts. I...
Saved in:
Main Author: | Putro Wijayanto, Dwi |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/35766 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Indonesiaâs New Oil & Gas Regime: Analysis of Cost Recovery PSC and Gross Split PSC Economic Analysis on Field X
by: Oktoria Winasta, Gresia -
CAPITAL BUDGETING MODEL WITH GROSS SPLIT PSC FOR SOUTHEAST SUMATRA GAS DEVELOPMENT PROJECT
by: PAULUS VIAN INDRASATWIKA (NIM 29316094), YOHANES -
COMPARISON OF ECONOMIC EVALUATION USING PSC COST RECOVERY AND GROSS SPLIT SCHEME FOR ALLOCATION OF NATUNA CO2 PRODUCTION UTILIZATION
by: MULIANDARI, WINDA -
COMPARATIVE ANALYSIS OF FINANCIAL REWARD ON GROSS SPLIT VERSUS CONVENTIONAL PSC FOR X FIELD OF Y BLOCK
by: Firwandi, Deni -
COMPARISON OF FISCAL SYSTEM PRODUCTION SHARING CONTRACT (PSC) (CONVENTIONAL AND GROSS SPLIT) INDONESIA WITH PSC ALGERIA AND MALAYSIA AND TECHNICAL SERVICE CONTRACT (TSC) IRAQ
by: FADLILA (NIM : 22214030), EVA