CAPITAL STRUCTURE ANALYSIS FOR 35.000 MW ELECTRICITY PROJECT (CASE STUDY: PT PLN PERSERO)

Electricity is the one of our basic needs these days and the demands of electricity are increasing along with the increasing population in Indonesia. To fulfill the increasing demands of the electricity, government created a program called 35.000 MW. The program later designated to PT PLN Persero to...

Full description

Saved in:
Bibliographic Details
Main Author: Putri Nirbaya, Marita
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/35929
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia