CAPITAL STRUCTURE ANALYSIS FOR 35.000 MW ELECTRICITY PROJECT (CASE STUDY: PT PLN PERSERO)
Electricity is the one of our basic needs these days and the demands of electricity are increasing along with the increasing population in Indonesia. To fulfill the increasing demands of the electricity, government created a program called 35.000 MW. The program later designated to PT PLN Persero to...
Saved in:
Main Author: | Putri Nirbaya, Marita |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/35929 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROPOSED STRATEGY FOR ELECTRICITY INDUSTRY OF PT PLN (PERSERO) PUSAT PEMELIHARAAN KETENAGALISTRIKAN (PLN PUSHARLIS)
by: Malia Khulda, Rizka -
FINANCIAL IMPACT ANALYSIS OF CARBON PRICING ON GEOTHERMAL POWER PLANT PROJECT INVESTMENT AT PT PLN (PERSERO)
by: Heryana, Arief -
RISK ASSESSMENT OF PUBLIC ELECTRIC VEHICLE BATTERY SWAPPING STATION (SPBKLU): CASE STUDY AT PT PLN (PERSERO)
by: Fata Herzasha, Azkal -
THE RELATIONSHIP BETWEEN DIGITAL CULTURE AND EMPLOYEE PERFORMANCE IN PT. PLN (PERSERO) UID JAKARTA RAYA AND PT. PLN (PERSERO) UP3 MENTENG
by: Utari Firstianti Medah, Fenycia -
INVESTMENT PROJECT ANALYSIS OF UNDERGROUND HIGH VOLTAGE CABLE REPLACEMENT : CASE STUDY OF PT PLN (PERSERO) IN AREA X
by: Tria Pratiwi, Novriani