INVESTMENT PROJECT ANALYSIS OF 120 MW COMBINED CYCLE POWER PLANT (CCPP) IN BATAM (CASE STUDY OF PT PLNB)

The Batam-Bintan electricity system is an integrated electric power system in which power plants on Batam Island and Bintan Island are connected to one another via distributed load centers. The largest load center is on Batam Island, and the highest peak load ever recorded was 587 MW in May 2023. Th...

Full description

Saved in:
Bibliographic Details
Main Author: Yuli Anggoro, Andryas
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/80124
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia