INVESTMENT PROJECT ANALYSIS OF 120 MW COMBINED CYCLE POWER PLANT (CCPP) IN BATAM (CASE STUDY OF PT PLNB)
The Batam-Bintan electricity system is an integrated electric power system in which power plants on Batam Island and Bintan Island are connected to one another via distributed load centers. The largest load center is on Batam Island, and the highest peak load ever recorded was 587 MW in May 2023. Th...
Saved in:
Main Author: | Yuli Anggoro, Andryas |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/80124 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS OF 30 MW GAS ENGINE POWERPLANT CONSTRUCTION IN BATAM (CASE STUDY OF PT. PLNB)
by: Arief Rachman, M -
INVESTMENT EVALUATION IN PT PELAYANAN ENERGI BATAM, CASE STUDY : GAS COMPRESSOR INVESTMENT PLTG 4 X 25 MW MALEO-GORONTALO
by: Siregar, Abdollah -
BAWEAN ISLAND 5 MW POWERPLANT PROJECT INVESTMENT ANALYSIS
by: Wied Hardono, Luddie -
INVESTMENT ANALYSIS OF GAS TURBINE COMBINED CYCLE TO REDUCE THE PRODUCTION COST OF PT XYZ: CASE STUDY IPP OF PT PLN BATAM
by: Kirana -
INVESTMENT ANALYSIS OF TOBELO POWERPLANT 30 MW PROJECT IN HALMAHERA ISLAND SYSTEM
by: Aditya Primanto, Irfan