PROPOSED INTEGRATED PROJECT AND RISK MANAGEMENT SYSTEM AT YAMAL LNG TRAIN 3 PROJECT ABSTRACT CASE: E&I-HOUSE MODULAR FABRICATION
The Train 3 sub-project of Yamal LNG, developed 2 fabrication yards at Batam Island, Kepulauan Riau Province, within a period of at least 17 months (Phase 1 until Phase 5). For the fabrication process, PT. XYZ was awarded as the subcontractor to complete three different job scopes. These consist o...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/62279 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |