PROPOSED INTEGRATED PROJECT AND RISK MANAGEMENT SYSTEM AT YAMAL LNG TRAIN 3 PROJECT ABSTRACT CASE: E&I-HOUSE MODULAR FABRICATION

The Train 3 sub-project of Yamal LNG, developed 2 fabrication yards at Batam Island, Kepulauan Riau Province, within a period of at least 17 months (Phase 1 until Phase 5). For the fabrication process, PT. XYZ was awarded as the subcontractor to complete three different job scopes. These consist o...

Full description

Saved in:
Bibliographic Details
Main Author: Anggoro, Prastiwo
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/62279
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:62279
spelling id-itb.:622792021-12-23T20:13:19ZPROPOSED INTEGRATED PROJECT AND RISK MANAGEMENT SYSTEM AT YAMAL LNG TRAIN 3 PROJECT ABSTRACT CASE: E&I-HOUSE MODULAR FABRICATION Anggoro, Prastiwo Manajemen umum Indonesia Theses Oil and Gas Project, Architectural system, HVAC, Piping Insulation, Project life cycle, ISO standard, Cost overruns, PMBOK 6 th Edition. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/62279 The Train 3 sub-project of Yamal LNG, developed 2 fabrication yards at Batam Island, Kepulauan Riau Province, within a period of at least 17 months (Phase 1 until Phase 5). For the fabrication process, PT. XYZ was awarded as the subcontractor to complete three different job scopes. These consist of architectural works, heating, ventilation, air conditioning system fabrication and commissioning the work, and piping insulation installation for the Yamal LNG Train 3 project. Due to complicated of process of each awarded project and un-controlled of resources manpower affected to 41% cost overruns. Furthermore, PT XYZ has become approved vendor list for main fabricator oil and gas at Batam Island. There are opportunities to obtain next E&I module project with integrated package of architectural works, heating, ventilation, air conditioning system fabrication and commissioning the work, and piping insulation installation. The purpose this thesis to determine root cause of cost overruns, analysis and create new project management system incoherence with integrated management system based on ISO standard. Based on the Project Management Body of Knowledge (PMBOK) Version 6, five processes are involved in managing projects— initiation, planning, monitoring, execution, and closing. As nature defines it, projects should have a beginning and an ending referred to as the "project life cycle/ PMBOK contains ten knowledge areas, and each knowledge area has inputs, tools and techniques, and outputs (ITTOs) that link together. A sharp analysis is needed to connect root cause and integrated solutions based on each affected area using the PMBOK Version 6 Framework. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Anggoro, Prastiwo
PROPOSED INTEGRATED PROJECT AND RISK MANAGEMENT SYSTEM AT YAMAL LNG TRAIN 3 PROJECT ABSTRACT CASE: E&I-HOUSE MODULAR FABRICATION
description The Train 3 sub-project of Yamal LNG, developed 2 fabrication yards at Batam Island, Kepulauan Riau Province, within a period of at least 17 months (Phase 1 until Phase 5). For the fabrication process, PT. XYZ was awarded as the subcontractor to complete three different job scopes. These consist of architectural works, heating, ventilation, air conditioning system fabrication and commissioning the work, and piping insulation installation for the Yamal LNG Train 3 project. Due to complicated of process of each awarded project and un-controlled of resources manpower affected to 41% cost overruns. Furthermore, PT XYZ has become approved vendor list for main fabricator oil and gas at Batam Island. There are opportunities to obtain next E&I module project with integrated package of architectural works, heating, ventilation, air conditioning system fabrication and commissioning the work, and piping insulation installation. The purpose this thesis to determine root cause of cost overruns, analysis and create new project management system incoherence with integrated management system based on ISO standard. Based on the Project Management Body of Knowledge (PMBOK) Version 6, five processes are involved in managing projects— initiation, planning, monitoring, execution, and closing. As nature defines it, projects should have a beginning and an ending referred to as the "project life cycle/ PMBOK contains ten knowledge areas, and each knowledge area has inputs, tools and techniques, and outputs (ITTOs) that link together. A sharp analysis is needed to connect root cause and integrated solutions based on each affected area using the PMBOK Version 6 Framework.
format Theses
author Anggoro, Prastiwo
author_facet Anggoro, Prastiwo
author_sort Anggoro, Prastiwo
title PROPOSED INTEGRATED PROJECT AND RISK MANAGEMENT SYSTEM AT YAMAL LNG TRAIN 3 PROJECT ABSTRACT CASE: E&I-HOUSE MODULAR FABRICATION
title_short PROPOSED INTEGRATED PROJECT AND RISK MANAGEMENT SYSTEM AT YAMAL LNG TRAIN 3 PROJECT ABSTRACT CASE: E&I-HOUSE MODULAR FABRICATION
title_full PROPOSED INTEGRATED PROJECT AND RISK MANAGEMENT SYSTEM AT YAMAL LNG TRAIN 3 PROJECT ABSTRACT CASE: E&I-HOUSE MODULAR FABRICATION
title_fullStr PROPOSED INTEGRATED PROJECT AND RISK MANAGEMENT SYSTEM AT YAMAL LNG TRAIN 3 PROJECT ABSTRACT CASE: E&I-HOUSE MODULAR FABRICATION
title_full_unstemmed PROPOSED INTEGRATED PROJECT AND RISK MANAGEMENT SYSTEM AT YAMAL LNG TRAIN 3 PROJECT ABSTRACT CASE: E&I-HOUSE MODULAR FABRICATION
title_sort proposed integrated project and risk management system at yamal lng train 3 project abstract case: e&i-house modular fabrication
url https://digilib.itb.ac.id/gdl/view/62279
_version_ 1822004061675716608