PROPOSED INTEGRATED PROJECT AND RISK MANAGEMENT SYSTEM AT YAMAL LNG TRAIN 3 PROJECT ABSTRACT CASE: E&I-HOUSE MODULAR FABRICATION

The Train 3 sub-project of Yamal LNG, developed 2 fabrication yards at Batam Island, Kepulauan Riau Province, within a period of at least 17 months (Phase 1 until Phase 5). For the fabrication process, PT. XYZ was awarded as the subcontractor to complete three different job scopes. These consist o...

Full description

Saved in:
Bibliographic Details
Main Author: Anggoro, Prastiwo
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/62279
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia