MINIMUM REVENUE GUARANTEE & TRAFFIC REVENUE CAP ON BATANG-SEMARANG AND PANDAAN-MALANG TOLL ROAD PROJECTS
In executing a toll road construction plan, government resolves to create a Public Private Partnership (PPP) with private sector due to a financially tight budget and chooses Build Operate Transfer (BOT) as its project delivery system. The sole risk existed in this project is revenue risk, which...
Saved in:
Main Author: | LIDYA MORAASI B., JOICE |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/36171 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
RISK ANALYSIS OF TRAFFIC AND REVENUE FORECASTS FOR TOLL ROAD INVESTMENT IN INDONESIA (Study Case : Terbanggi Besar-Bakauheni Path Tegineneng-Babatan Toll Road)
by: Indra Dharmawan (NIM : 25006014) , Weka -
EFFECTS OF THE JUNE-1983 AND SEPTEMBER-1985 INCREASES IN TOLL CHARGES ON TRAFFIC FLOWS AND REVENUES: the Jagorawi toll highway
by: Rin Prabowo, Agung -
STUDY OF REFINANCING SCHEME ON TOLL ROAD INFRASTRUCTURE (CASE STUDY: GEMPOL-PANDAAN TOLL ROAD)
by: Nurhadi Sunarya, Nesa -
INVESTMENT STUDY OF TOLL ROAD DEVELOPMENT USING HAJJ FUNDS (STUDY CASE: GEMPOL-PANDAAN TOLL ROAD)
by: Dzulfiqar Alfiansyah, Achmad -
GILIMANUK â MENGWI TOLL ROAD INVESTMENT ANALYSIS AND IMPACT TO LOCAL GOVERNMENT REVENUE: CASE STUDY OF JEMBRANA REGENCY
by: Nurhayati Permana, Shezy