Improvement of Water Flow Visualization on Minihydro Power Plant Kambangan 5 MW

The energy needs can’t be separated from many aspects of human activity where nowadays we need a big amount of energy especially in regions that already can access electrical energy to support their activities. Energy needs must be complemented by the the energy capacity that Indonesia government pr...

Full description

Saved in:
Bibliographic Details
Main Author: Thoriq Al Hafiz, A
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/36568
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:36568
spelling id-itb.:365682019-03-13T14:34:15ZImprovement of Water Flow Visualization on Minihydro Power Plant Kambangan 5 MW Thoriq Al Hafiz, A Indonesia Final Project MHP, Sandtrap, Forebay Tank INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/36568 The energy needs can’t be separated from many aspects of human activity where nowadays we need a big amount of energy especially in regions that already can access electrical energy to support their activities. Energy needs must be complemented by the the energy capacity that Indonesia government provides so that the country electricity production can satisfy the country electricity consumption. One of the effort that the Indonesia government has been doing is building a Mini-Hydro Power Plant (MHP). Kambangan MHP is one of MHP that is being under development and potentially can produce 5 MW of electricity. This final project is aiming to make an improvement on the water flow visualization of Kambangan MHP. in addition of improving the visualization, the author also design a sandtrap and forebay tank using Autodesk Inventor that is more economical in terms dimensioning. To achieve that, the aim of the design is to make the building as short as possible. On improving the water flow visualization, the author uses graphic design software Goggle sketchup and Lumion 8 to aquire a better result. After calculation process, obtained the best design of sandtrap with length, width and height such as 50 m, 6m and 2,9 m. At the same time, for forebay tank it is obtained a design that satisfy the must criteria with length, width, and height that is 69 m, 9 m, and 2,5 m. The result of static loading simulation on the water bridge yields maximum 1st principal stress, maximum deflection and smallest safety factor location with values in range of recommended values from used references and material strength. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The energy needs can’t be separated from many aspects of human activity where nowadays we need a big amount of energy especially in regions that already can access electrical energy to support their activities. Energy needs must be complemented by the the energy capacity that Indonesia government provides so that the country electricity production can satisfy the country electricity consumption. One of the effort that the Indonesia government has been doing is building a Mini-Hydro Power Plant (MHP). Kambangan MHP is one of MHP that is being under development and potentially can produce 5 MW of electricity. This final project is aiming to make an improvement on the water flow visualization of Kambangan MHP. in addition of improving the visualization, the author also design a sandtrap and forebay tank using Autodesk Inventor that is more economical in terms dimensioning. To achieve that, the aim of the design is to make the building as short as possible. On improving the water flow visualization, the author uses graphic design software Goggle sketchup and Lumion 8 to aquire a better result. After calculation process, obtained the best design of sandtrap with length, width and height such as 50 m, 6m and 2,9 m. At the same time, for forebay tank it is obtained a design that satisfy the must criteria with length, width, and height that is 69 m, 9 m, and 2,5 m. The result of static loading simulation on the water bridge yields maximum 1st principal stress, maximum deflection and smallest safety factor location with values in range of recommended values from used references and material strength.
format Final Project
author Thoriq Al Hafiz, A
spellingShingle Thoriq Al Hafiz, A
Improvement of Water Flow Visualization on Minihydro Power Plant Kambangan 5 MW
author_facet Thoriq Al Hafiz, A
author_sort Thoriq Al Hafiz, A
title Improvement of Water Flow Visualization on Minihydro Power Plant Kambangan 5 MW
title_short Improvement of Water Flow Visualization on Minihydro Power Plant Kambangan 5 MW
title_full Improvement of Water Flow Visualization on Minihydro Power Plant Kambangan 5 MW
title_fullStr Improvement of Water Flow Visualization on Minihydro Power Plant Kambangan 5 MW
title_full_unstemmed Improvement of Water Flow Visualization on Minihydro Power Plant Kambangan 5 MW
title_sort improvement of water flow visualization on minihydro power plant kambangan 5 mw
url https://digilib.itb.ac.id/gdl/view/36568
_version_ 1821997167226650624