IMPLEMENTATION OF PROJECT LIFE CYCLE ON ROUTE SURVEY PROJECT (CASE STUDY: PT. SURVEY ARCHIPELAGO INDONESIA)

In this period, Indonesian Government bring a quietly wide opportunity for survey and mapping consultant, based on the Indonesia infrastructure development plan from 2015 to 2019 especially roads and irrigation. Surveying is the initial work in any infrastructure project, wherever it irrigation nor...

Full description

Saved in:
Bibliographic Details
Main Author: Putu Indra Gunawan, Sang
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/36929
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:36929
spelling id-itb.:369292019-03-16T14:43:08ZIMPLEMENTATION OF PROJECT LIFE CYCLE ON ROUTE SURVEY PROJECT (CASE STUDY: PT. SURVEY ARCHIPELAGO INDONESIA) Putu Indra Gunawan, Sang Indonesia Theses Operation, Project Management, Project Life Cycle, Strategy INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/36929 In this period, Indonesian Government bring a quietly wide opportunity for survey and mapping consultant, based on the Indonesia infrastructure development plan from 2015 to 2019 especially roads and irrigation. Surveying is the initial work in any infrastructure project, wherever it irrigation nor roads project. Surveying is often being underestimated, not only from project owner and contractor, but also from the surveyor themselves. The author examines: PT. Survey Archipelago Indonesia, as a company which engaged in survey and mapping service. From this study, the company expected they can develop a project with comprehensive plan, so that the optimum cost and scheduling can be generated. Issues raised from PT. Survey Archipelago Indonesia’s experience on route survey project is the project run out of the time and cost estimated. In business issues exploration, these data will be analyzed using literature review of project management, from defining phase, planning, executing, until closing. These was done to find out why the route survey project run out of the time and estimate cost. Some tools that will be use in this research are: project scope checklist, project priority matrix, work and organization breakdown structure, project network, and then time-phased budget baseline. As the end of this chapter researcher conclude that, company for technical task were well executed, but inconsistency still appear on real schedule and real expenditure, from project life cycle the source of problem are on defining and planning phase. In defining phase, the company should filtering propose project by price per-Km criteria and Km per-day criteria. After defining phase already passed, company can optimized their resources to obtain optimum schedule of completion and project cost. As the solution for this research a new implementation of operation model will be beneficial for PT. Survey Archipelago Indonesia. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In this period, Indonesian Government bring a quietly wide opportunity for survey and mapping consultant, based on the Indonesia infrastructure development plan from 2015 to 2019 especially roads and irrigation. Surveying is the initial work in any infrastructure project, wherever it irrigation nor roads project. Surveying is often being underestimated, not only from project owner and contractor, but also from the surveyor themselves. The author examines: PT. Survey Archipelago Indonesia, as a company which engaged in survey and mapping service. From this study, the company expected they can develop a project with comprehensive plan, so that the optimum cost and scheduling can be generated. Issues raised from PT. Survey Archipelago Indonesia’s experience on route survey project is the project run out of the time and cost estimated. In business issues exploration, these data will be analyzed using literature review of project management, from defining phase, planning, executing, until closing. These was done to find out why the route survey project run out of the time and estimate cost. Some tools that will be use in this research are: project scope checklist, project priority matrix, work and organization breakdown structure, project network, and then time-phased budget baseline. As the end of this chapter researcher conclude that, company for technical task were well executed, but inconsistency still appear on real schedule and real expenditure, from project life cycle the source of problem are on defining and planning phase. In defining phase, the company should filtering propose project by price per-Km criteria and Km per-day criteria. After defining phase already passed, company can optimized their resources to obtain optimum schedule of completion and project cost. As the solution for this research a new implementation of operation model will be beneficial for PT. Survey Archipelago Indonesia.
format Theses
author Putu Indra Gunawan, Sang
spellingShingle Putu Indra Gunawan, Sang
IMPLEMENTATION OF PROJECT LIFE CYCLE ON ROUTE SURVEY PROJECT (CASE STUDY: PT. SURVEY ARCHIPELAGO INDONESIA)
author_facet Putu Indra Gunawan, Sang
author_sort Putu Indra Gunawan, Sang
title IMPLEMENTATION OF PROJECT LIFE CYCLE ON ROUTE SURVEY PROJECT (CASE STUDY: PT. SURVEY ARCHIPELAGO INDONESIA)
title_short IMPLEMENTATION OF PROJECT LIFE CYCLE ON ROUTE SURVEY PROJECT (CASE STUDY: PT. SURVEY ARCHIPELAGO INDONESIA)
title_full IMPLEMENTATION OF PROJECT LIFE CYCLE ON ROUTE SURVEY PROJECT (CASE STUDY: PT. SURVEY ARCHIPELAGO INDONESIA)
title_fullStr IMPLEMENTATION OF PROJECT LIFE CYCLE ON ROUTE SURVEY PROJECT (CASE STUDY: PT. SURVEY ARCHIPELAGO INDONESIA)
title_full_unstemmed IMPLEMENTATION OF PROJECT LIFE CYCLE ON ROUTE SURVEY PROJECT (CASE STUDY: PT. SURVEY ARCHIPELAGO INDONESIA)
title_sort implementation of project life cycle on route survey project (case study: pt. survey archipelago indonesia)
url https://digilib.itb.ac.id/gdl/view/36929
_version_ 1822924771628679168