DESIGN OF METHOD OF CONSTRUCTION OF ALAM SUTERA APARTMENT, TANGERANG

An apartment is planned to be constructed in Alam Sutera, Tangerang City. Initially, the construction of the apartment is based on the drawings which is proposed by the architect. The challanges for the civil engineer is to design the method and components of the structure to be more economic and...

Full description

Saved in:
Bibliographic Details
Main Author: Gunarso, Nicholas
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/36945
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:36945
spelling id-itb.:369452019-03-18T08:48:33ZDESIGN OF METHOD OF CONSTRUCTION OF ALAM SUTERA APARTMENT, TANGERANG Gunarso, Nicholas Indonesia Final Project Skybridge installation, dewatering, plan of basement construction INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/36945 An apartment is planned to be constructed in Alam Sutera, Tangerang City. Initially, the construction of the apartment is based on the drawings which is proposed by the architect. The challanges for the civil engineer is to design the method and components of the structure to be more economic and ensure the stability of the apartment. In construction management, there are two major aspects which need to be planned which are installation of skybridge and also construction of basement. The installation of skybridge is planned to use hydraulic jack. Later on the construction process, the bridge will be segmented into 3 parts which include 2 parts of side bridge which later are going to be constructed on the elevation of 44,5 meter and 1 part of middle bridge which later is going to be constructed on the ground level and going to be pulled by hydraulic jack to elevation 44,5 meter. During the design process, ETABS will be used to design the connection between the middle bridge and hydraulic jack and also to design stell tendon as a reinforcement for the side skybridge. As for the construction of basement, there are mainly three jobs which are the job of dewatering, determining duration of basement construction and also the method of lifting the mini excavator from elevation minus 13 meter to ground level. Rectangular section is used as drainage channel in order to simplify the construction method of drainage. As for the job of dewatering, it is planned to use automatic submersible pump from Tsurumi type KTVE 33.7 which has the capacity of flor 600 litre/minutes for 15 m head capacity. As for the basement construction, the ordinary method of slices will be used to consider the slope stability. As for the heavy equipment of mini excavator Komatsu PC 100-6 will be carried out by crawler crane Kobelco CKE 1350 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description An apartment is planned to be constructed in Alam Sutera, Tangerang City. Initially, the construction of the apartment is based on the drawings which is proposed by the architect. The challanges for the civil engineer is to design the method and components of the structure to be more economic and ensure the stability of the apartment. In construction management, there are two major aspects which need to be planned which are installation of skybridge and also construction of basement. The installation of skybridge is planned to use hydraulic jack. Later on the construction process, the bridge will be segmented into 3 parts which include 2 parts of side bridge which later are going to be constructed on the elevation of 44,5 meter and 1 part of middle bridge which later is going to be constructed on the ground level and going to be pulled by hydraulic jack to elevation 44,5 meter. During the design process, ETABS will be used to design the connection between the middle bridge and hydraulic jack and also to design stell tendon as a reinforcement for the side skybridge. As for the construction of basement, there are mainly three jobs which are the job of dewatering, determining duration of basement construction and also the method of lifting the mini excavator from elevation minus 13 meter to ground level. Rectangular section is used as drainage channel in order to simplify the construction method of drainage. As for the job of dewatering, it is planned to use automatic submersible pump from Tsurumi type KTVE 33.7 which has the capacity of flor 600 litre/minutes for 15 m head capacity. As for the basement construction, the ordinary method of slices will be used to consider the slope stability. As for the heavy equipment of mini excavator Komatsu PC 100-6 will be carried out by crawler crane Kobelco CKE 1350
format Final Project
author Gunarso, Nicholas
spellingShingle Gunarso, Nicholas
DESIGN OF METHOD OF CONSTRUCTION OF ALAM SUTERA APARTMENT, TANGERANG
author_facet Gunarso, Nicholas
author_sort Gunarso, Nicholas
title DESIGN OF METHOD OF CONSTRUCTION OF ALAM SUTERA APARTMENT, TANGERANG
title_short DESIGN OF METHOD OF CONSTRUCTION OF ALAM SUTERA APARTMENT, TANGERANG
title_full DESIGN OF METHOD OF CONSTRUCTION OF ALAM SUTERA APARTMENT, TANGERANG
title_fullStr DESIGN OF METHOD OF CONSTRUCTION OF ALAM SUTERA APARTMENT, TANGERANG
title_full_unstemmed DESIGN OF METHOD OF CONSTRUCTION OF ALAM SUTERA APARTMENT, TANGERANG
title_sort design of method of construction of alam sutera apartment, tangerang
url https://digilib.itb.ac.id/gdl/view/36945
_version_ 1822924775294500864