OPEN DRAINAGE DESIGN, PLANNING IMPLEMENTATION METHOD, AND COST ESTIMATION OF RUSUNAWA CINGISED II BANDUNG PROJECT
Rusunawa Cingised Bandung is one of the Bandung government projects that was built to move slum residents who have the status of LIC to multi-storey housing. Then in the coming period, the Bandung city government plans to develop Cingised Rusunawa by adding several towers on the available land. In o...
Saved in:
Main Author: | Gania Nugraha, Fariz |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/37146 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
HOUSING TRANSFORMATION OF RUSUNAWA IN GREATER BANDUNG (CASE STUDY: RUSUNAWA BALEENDAH, RUSUNAWA CINGISED, RUSUNAWA RANCACILI)
by: Yuda Wardiana, Indra -
DESIGN OF FOUNDATION SYSTEM AND RETAINING WALL STRUCTURE FOR BASEMENT CONSTRUCTION OF RUSUNAWA CINGISED II BANDUNG
by: Rizaldi Perkasa, Muhammad -
CINGISED SOCIAL HOUSING DEVELOPMENT AT BANDUNG CITY
by: Abdurrahman, Muhammad -
CONSTRUCTION IMPLEMENTATION METHOD PLANNING, SCHEDULING AND CONSTRUCTION COST ESTIMATION FOR FLUID ARCHITECTURE BUILDING PROJECT AT CIBADAK, BANDUNG
by: Khumairah Marhenda, Nabilah -
PLANNING IMPLEMENTATION METHOD, SCHEDULING, AND COST ESTIMATION OF CONTEMPORARY ART MUSEUM PROJECT
by: RIZKA, MUTHIANA