HEAT RATE GAP ANALYSIS ON STEAM POWER PLANT CAPACITY 220 MW
The Pangkalan Susu Power Plant is one of the biggest power plants that has a big influence on the electricity system in North Sumatra and has been operating for more than four years. Therefore, unit reliability is expected to maintain electricity supply, reliability can be seen from the parameter...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/37831 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!