HEAT RATE GAP ANALYSIS ON STEAM POWER PLANT CAPACITY 220 MW
The Pangkalan Susu Power Plant is one of the biggest power plants that has a big influence on the electricity system in North Sumatra and has been operating for more than four years. Therefore, unit reliability is expected to maintain electricity supply, reliability can be seen from the parameter...
Saved in:
Main Author: | Adhi Kuncoro, Mahendra |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/37831 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
CFD SIMULATION OF COFIRING OF COAL AND BIOMASS IN A600 MW STEAM POWER PLANT
by: Rahadian, Anugrah -
IMPROVEMENT OF STEAM PURITY GEOTHERMAL POWER PLANT WITH AIR COOLED HEAT EXCHANGER
by: Akbar Kharisma, Rafi -
THE HRSG MODELLING AND THE SPREADSHEET FOR HEAT BALANCE CALCULATION OF MUARA KARANG GAS AND STEAM POWER PLANT
by: Karim Idris, Abdul -
STUDY OF GEOTHERMAL STEAM PURITY IN GEOTHERMAL POWER PLANT
by: Wilantara, Bayu -
BRINE PIPING SYSTEM DESIGN IN GEOTHERMAL POWER PLANT FACILITIES CIBUNI 10 MW NETT.
by: Victor Setiyohadi, Eunico