UTILIZATION STUDY OF EXCESS STEAM FROM VENT VALVE IN PLTP KAMOJANG
This research discussed an opportunity utilization of excess steam from vent valve in PLTP Kamojang as a new geothermal power plant uses dry steam cycle, binary cycle and Kalina cycle. The initial stage of this research was to modelling three cycle using Aspen-Hysys to obtain the properties of state...
Saved in:
Main Author: | Sundari, Putri |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/37857 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
UNIT 2 KAMOJANG GEOTHERMAL POWER PLANT UP-RATED
by: Ambarita, Ervant -
PERANCANGAN SISTEM PERPIPAAN PADA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (STUDI KASUS: PLTP UNIT IV LAHENDONG KLUSTER 24)
by: Pradipta, Irfan -
COMPARATIVE STUDY OF LOW RANK COAL UTILIZATION BETWEEN UNDERGROUND COAL GASIFICATION AND MINE MOUTH COAL FIRED STEAM POWER PLANT
by: YANUAR ADISAPUTRA, YUDHA -
DESIGN OF A HELICAL TYPE STEAM GENERATOR FOR EXPERIMENTAL POWER REACTORS
by: Ineza Putri, Sunny -
IDENTIFYING GEOTHERMAL SYSTEM USING SURFACE TEMPERATURE DERIVED BY SATELLITE IMAGE AND GEOLOGICAL OBSERVATION IN GUNTUR-KAMOJANG VOLCANIC COMPLEX, WEST JAVA
by: Rahma Yoni, Dian