PLANNING DESIGN OF PICO HYDRO POWER PLANT “HYBRID PUMPED STORAGE” AT ITB CAMPUS, JATINANGOR DISTRICT, SUMEDANG REGENCY

The need of electrical energy is increasing along with the development of technology that increasingly dependent on electrical energy. Electrical energy is needed by many circles, both for small scale and big scale, both for educational needs or for public needs. So that there needs to be an effort...

Full description

Saved in:
Bibliographic Details
Main Author: Azman Ahdallah, Muhammad
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/39070
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia