PLANNING DESIGN OF PICO HYDRO POWER PLANT âHYBRID PUMPED STORAGEâ AT ITB CAMPUS, JATINANGOR DISTRICT, SUMEDANG REGENCY
The need of electrical energy is increasing along with the development of technology that increasingly dependent on electrical energy. Electrical energy is needed by many circles, both for small scale and big scale, both for educational needs or for public needs. So that there needs to be an effort...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/39070 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |