IMPLEMENTATION OF RCM AND FMEA ON CIKAL NUSANTARA PROJECT
Shell Eco-marathon is a competition aiming to search for the most efficient car that has participants from universities around the world. Indonesia send several numbers of team for this competition, one of them is Cikal team. During the car creation process, Cikal team faced many failures. To pre...
Saved in:
Main Author: | Kridha L, Bryan |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39083 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PROPOSAL TO IMPLEMENT RCM (FMEA & LTA ) APPROACH IN SELECTION MAINTENANCE TASK OF ROTATING EQUIPMENT HYDROGEN MAKE UP COMPRESSOR PT XYZ
by: Unitrya, Rio -
IMPLEMENTATION OF FAILURE MODE AND EFFECT ANALYSIS (FMEA) AND FAULT TREE ANALYSIS (FTA) IN RELIABILITY CENTERED MAINTENANCE (RCM): APPLICATION ON MICRO HYDRO POWER PLANT CASE
by: Muhammad Hadiutama, Nur -
PENERAPAN RCM DAN FMEA PADA TURBIN GAS KOMPRESOR. STUDIKASUS PADA ECHO FLOW STATION PERTAMINA HULU ENERGY ONWS.
by: Charly, Thomas -
CIKAL BAKAL POLITIK DINASTI FADELI
by: Hidayatul Mahfiroh, 071311333104
Published: (2017) -
Oral History Pendopo Agung Dan Cikal Bakal Kerajaan Majapahit
by: Muhammad Syafi'i, -
Published: (2018)