DESIGN OF CONSTRUCTION METHOD, DURATION AND COST ESTIMATION OF GREEN RIBBON, MIXED-USE BUILDING IN MANGGARAI, SOUTH JAKARTA
Green Ribbon is a 20-stories mixed-use building located in Manggarai, South Jakarta, that will be used as shopping center, recreation dan apartment. This Final Project consists of the planning of construction method, duration calculation and cost estimation. Using data obtained from environment’s co...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39130 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:39130 |
---|---|
spelling |
id-itb.:391302019-06-24T10:06:06ZDESIGN OF CONSTRUCTION METHOD, DURATION AND COST ESTIMATION OF GREEN RIBBON, MIXED-USE BUILDING IN MANGGARAI, SOUTH JAKARTA Leonardo Indonesia Final Project mixed use, project scheduling, construction method, construction cost estimation, lead resources, S curve, resources optimization. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39130 Green Ribbon is a 20-stories mixed-use building located in Manggarai, South Jakarta, that will be used as shopping center, recreation dan apartment. This Final Project consists of the planning of construction method, duration calculation and cost estimation. Using data obtained from environment’s condition, and structural and geotechnical’s technical drawing, design of construction methods can proceed as planned. Early stages of planning consist of selecting the most appropriate method based on tasks needed. Task will be divided into 6 main tasks, consisting of preparation stage, cut and fill stage, construction of lower structures stage, construction of upper structures stage, arsitectural and MEP. After selecting construction method, construction cost can be estimated by using unit method analysis. Total cost of Green Ribbon is Rp.1.058.575.817.999,70. Productivities will be calculated using lead resources analysis from workers and machines In the end of scheduling, resources used during construction will be optimized by using resource leveling and resource allocation. As a result, total duration for Green Ribbon project is 876,11 days. Final result of duration and cost estimaed will be presented as S-curve which shows task progression according to time. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Green Ribbon is a 20-stories mixed-use building located in Manggarai, South Jakarta, that will be used as shopping center, recreation dan apartment. This Final Project consists of the planning of construction method, duration calculation and cost estimation. Using data obtained from environment’s condition, and structural and geotechnical’s technical drawing, design of construction methods can proceed as planned. Early stages of planning consist of selecting the most appropriate method based on tasks needed. Task will be divided into 6 main tasks, consisting of preparation stage, cut and fill stage, construction of lower structures stage, construction of upper structures stage, arsitectural and MEP. After selecting construction method, construction cost can be estimated by using unit method analysis. Total cost of Green Ribbon is Rp.1.058.575.817.999,70. Productivities will be calculated using lead resources analysis from workers and machines In the end of scheduling, resources used during construction will be optimized by using resource leveling and resource allocation. As a result, total duration for Green Ribbon project is 876,11 days. Final result of duration and cost estimaed will be presented as S-curve which shows task progression according to time.
|
format |
Final Project |
author |
Leonardo |
spellingShingle |
Leonardo DESIGN OF CONSTRUCTION METHOD, DURATION AND COST ESTIMATION OF GREEN RIBBON, MIXED-USE BUILDING IN MANGGARAI, SOUTH JAKARTA |
author_facet |
Leonardo |
author_sort |
Leonardo |
title |
DESIGN OF CONSTRUCTION METHOD, DURATION AND COST ESTIMATION OF GREEN RIBBON, MIXED-USE BUILDING IN MANGGARAI, SOUTH JAKARTA |
title_short |
DESIGN OF CONSTRUCTION METHOD, DURATION AND COST ESTIMATION OF GREEN RIBBON, MIXED-USE BUILDING IN MANGGARAI, SOUTH JAKARTA |
title_full |
DESIGN OF CONSTRUCTION METHOD, DURATION AND COST ESTIMATION OF GREEN RIBBON, MIXED-USE BUILDING IN MANGGARAI, SOUTH JAKARTA |
title_fullStr |
DESIGN OF CONSTRUCTION METHOD, DURATION AND COST ESTIMATION OF GREEN RIBBON, MIXED-USE BUILDING IN MANGGARAI, SOUTH JAKARTA |
title_full_unstemmed |
DESIGN OF CONSTRUCTION METHOD, DURATION AND COST ESTIMATION OF GREEN RIBBON, MIXED-USE BUILDING IN MANGGARAI, SOUTH JAKARTA |
title_sort |
design of construction method, duration and cost estimation of green ribbon, mixed-use building in manggarai, south jakarta |
url |
https://digilib.itb.ac.id/gdl/view/39130 |
_version_ |
1822925206173253632 |