STUDY OF POTENTIAL FOR INTEGRATED PROJECT DELIVERY IMPLEMENTATION IN THE HIGH RISE DEVELOPMENT PROCESS IN PT WIKA REALTY
In general, one assessment of the success of a construction project is seen from the control of costs that do not exceed the plan. Based on company data it is known that the dominant cause of the cost overrun of construction projects carried out by the company is design changes, addition scope of wo...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39157 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |