STUDY OF POTENTIAL FOR INTEGRATED PROJECT DELIVERY IMPLEMENTATION IN THE HIGH RISE DEVELOPMENT PROCESS IN PT WIKA REALTY

In general, one assessment of the success of a construction project is seen from the control of costs that do not exceed the plan. Based on company data it is known that the dominant cause of the cost overrun of construction projects carried out by the company is design changes, addition scope of wo...

Full description

Saved in:
Bibliographic Details
Main Author: Bazaruddin
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/39157
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia