PROBLEM AND PROPOSED PROCEDURES FOR MANAGEMENT OF PUBLIC HOUSING FACILITIES IN WEST BANDUNG DISTRICT
Management of housing facilities is one of the efforts to ensure a decent living environment. Management of housing facilities starts with the development process undertaken by the developer. As a public good, local governments have an obligation to ensure the availability of PSU housing for thei...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/39298 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:39298 |
---|---|
spelling |
id-itb.:392982019-06-25T13:32:05ZPROBLEM AND PROPOSED PROCEDURES FOR MANAGEMENT OF PUBLIC HOUSING FACILITIES IN WEST BANDUNG DISTRICT Nurwati, Listiana Perencanaan wilayah Indonesia Theses Facilities, Housing, Transfer, Management INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39298 Management of housing facilities is one of the efforts to ensure a decent living environment. Management of housing facilities starts with the development process undertaken by the developer. As a public good, local governments have an obligation to ensure the availability of PSU housing for their communities. Thus, after the construction progresses, the developers are required to submit their PSU housing to the local government. West Bandung district itself with the legal basis that has been owned, which are perda and perbup, but the achievement of delivery of PSU housing only amounted to three housing from a total of one hundred and thirteen housing. Based on this issue, the purpose of this research is to formulate the proposed procedures for the management of PSU housing in West Bandung district by considering the problems that occur. This research used qualitative research method with descriptive analysis. Informants in this research were selected by using nonprobability sampling technique (purposive sampling). The data collection in this research used interview technique, documentation study and observation. This research has several targets such as: PSU Housing management procedure in accordance with permendagri, problems that occur in the management of PSU housing using comparative analysis techniques, aspects considered in the management of PSU housing as well as the role of each actor involved in the management of housing PSU in West Bandung district. The results of this research indicate that there are still many problems that inhibit the management of PSU housing in West Bandung district. Some of these problems are among actors who have not run their roles optimally, the rules of submission of PSU housing has not been applied optimally, and coordination between actors involved has not been well established. Thus the procedure of managing the PSU housing needs to be adjusted. One of them is by conducting the process of handling the PSU housing administrative in the early stages of filing for housing construction permit. While the physical of PSU is handed over after the PSU housing is completed text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Perencanaan wilayah |
spellingShingle |
Perencanaan wilayah Nurwati, Listiana PROBLEM AND PROPOSED PROCEDURES FOR MANAGEMENT OF PUBLIC HOUSING FACILITIES IN WEST BANDUNG DISTRICT |
description |
Management of housing facilities is one of the efforts to ensure a decent living
environment. Management of housing facilities starts with the development
process undertaken by the developer. As a public good, local governments have
an obligation to ensure the availability of PSU housing for their communities.
Thus, after the construction progresses, the developers are required to submit their
PSU housing to the local government. West Bandung district itself with the legal
basis that has been owned, which are perda and perbup, but the achievement of
delivery of PSU housing only amounted to three housing from a total of one
hundred and thirteen housing. Based on this issue, the purpose of this research is
to formulate the proposed procedures for the management of PSU housing in
West Bandung district by considering the problems that occur.
This research used qualitative research method with descriptive analysis.
Informants in this research were selected by using nonprobability sampling
technique (purposive sampling). The data collection in this research used
interview technique, documentation study and observation. This research has
several targets such as: PSU Housing management procedure in accordance with
permendagri, problems that occur in the management of PSU housing using
comparative analysis techniques, aspects considered in the management of PSU
housing as well as the role of each actor involved in the management of housing
PSU in West Bandung district.
The results of this research indicate that there are still many problems that inhibit
the management of PSU housing in West Bandung district. Some of these
problems are among actors who have not run their roles optimally, the rules of
submission of PSU housing has not been applied optimally, and coordination
between actors involved has not been well established. Thus the procedure of
managing the PSU housing needs to be adjusted. One of them is by conducting
the process of handling the PSU housing administrative in the early stages of
filing for housing construction permit. While the physical of PSU is handed over
after the PSU housing is completed |
format |
Theses |
author |
Nurwati, Listiana |
author_facet |
Nurwati, Listiana |
author_sort |
Nurwati, Listiana |
title |
PROBLEM AND PROPOSED PROCEDURES FOR MANAGEMENT OF PUBLIC HOUSING FACILITIES IN WEST BANDUNG DISTRICT |
title_short |
PROBLEM AND PROPOSED PROCEDURES FOR MANAGEMENT OF PUBLIC HOUSING FACILITIES IN WEST BANDUNG DISTRICT |
title_full |
PROBLEM AND PROPOSED PROCEDURES FOR MANAGEMENT OF PUBLIC HOUSING FACILITIES IN WEST BANDUNG DISTRICT |
title_fullStr |
PROBLEM AND PROPOSED PROCEDURES FOR MANAGEMENT OF PUBLIC HOUSING FACILITIES IN WEST BANDUNG DISTRICT |
title_full_unstemmed |
PROBLEM AND PROPOSED PROCEDURES FOR MANAGEMENT OF PUBLIC HOUSING FACILITIES IN WEST BANDUNG DISTRICT |
title_sort |
problem and proposed procedures for management of public housing facilities in west bandung district |
url |
https://digilib.itb.ac.id/gdl/view/39298 |
_version_ |
1822925250997780480 |