OPTIMIZATION OF SEI ROKAN BIOGASS POWER PLANT AND SEI TAPUNG BIOGASS POWER PLANT CAPACITY IN RIAU SYSTEM INTERCONECTION STUDY

Riau is the largest contributor to crude palm oil exports in Indonesia. Riau is still experiencing a crisis in electricity that is characterized by rotating power outages in the middle of the community. The electricity crisis is important to be anticipated by making a new breakthrough to find altern...

Full description

Saved in:
Bibliographic Details
Main Author: Nurhayati, Gina
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/39316
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:39316
spelling id-itb.:393162019-06-25T14:41:01ZOPTIMIZATION OF SEI ROKAN BIOGASS POWER PLANT AND SEI TAPUNG BIOGASS POWER PLANT CAPACITY IN RIAU SYSTEM INTERCONECTION STUDY Nurhayati, Gina Indonesia Final Project Biogas Power Plant (PLTBg), power flow analysis, short circuit ratio, transient stability. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39316 Riau is the largest contributor to crude palm oil exports in Indonesia. Riau is still experiencing a crisis in electricity that is characterized by rotating power outages in the middle of the community. The electricity crisis is important to be anticipated by making a new breakthrough to find alternative electrical energy sources in the form of new and renewable energy based on palm oil mill effluent. The utilization of palm oil liquid waste into electricity is a form of waste to energy optimization which is one of the steps in Indonesia's contribution in reducing greenhouse gas emissions. The electrical system of PasirPengaraian is one of Riau's isolated systems. In 2020 the system will be supplied from the interconnection of the 150 kV Riau’s system. Because it will ignore the power existing, it is planned to build two Biogas Power Plants (PLTBg). Generator capacity is still a proposal, so an analysis of optimization of generating capacity is needed so that the best results for the system are obtained. The optimization is based on technical criteria such as power flow analysis, validation of short circuit ratio, and transient stability analysis. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Riau is the largest contributor to crude palm oil exports in Indonesia. Riau is still experiencing a crisis in electricity that is characterized by rotating power outages in the middle of the community. The electricity crisis is important to be anticipated by making a new breakthrough to find alternative electrical energy sources in the form of new and renewable energy based on palm oil mill effluent. The utilization of palm oil liquid waste into electricity is a form of waste to energy optimization which is one of the steps in Indonesia's contribution in reducing greenhouse gas emissions. The electrical system of PasirPengaraian is one of Riau's isolated systems. In 2020 the system will be supplied from the interconnection of the 150 kV Riau’s system. Because it will ignore the power existing, it is planned to build two Biogas Power Plants (PLTBg). Generator capacity is still a proposal, so an analysis of optimization of generating capacity is needed so that the best results for the system are obtained. The optimization is based on technical criteria such as power flow analysis, validation of short circuit ratio, and transient stability analysis.
format Final Project
author Nurhayati, Gina
spellingShingle Nurhayati, Gina
OPTIMIZATION OF SEI ROKAN BIOGASS POWER PLANT AND SEI TAPUNG BIOGASS POWER PLANT CAPACITY IN RIAU SYSTEM INTERCONECTION STUDY
author_facet Nurhayati, Gina
author_sort Nurhayati, Gina
title OPTIMIZATION OF SEI ROKAN BIOGASS POWER PLANT AND SEI TAPUNG BIOGASS POWER PLANT CAPACITY IN RIAU SYSTEM INTERCONECTION STUDY
title_short OPTIMIZATION OF SEI ROKAN BIOGASS POWER PLANT AND SEI TAPUNG BIOGASS POWER PLANT CAPACITY IN RIAU SYSTEM INTERCONECTION STUDY
title_full OPTIMIZATION OF SEI ROKAN BIOGASS POWER PLANT AND SEI TAPUNG BIOGASS POWER PLANT CAPACITY IN RIAU SYSTEM INTERCONECTION STUDY
title_fullStr OPTIMIZATION OF SEI ROKAN BIOGASS POWER PLANT AND SEI TAPUNG BIOGASS POWER PLANT CAPACITY IN RIAU SYSTEM INTERCONECTION STUDY
title_full_unstemmed OPTIMIZATION OF SEI ROKAN BIOGASS POWER PLANT AND SEI TAPUNG BIOGASS POWER PLANT CAPACITY IN RIAU SYSTEM INTERCONECTION STUDY
title_sort optimization of sei rokan biogass power plant and sei tapung biogass power plant capacity in riau system interconection study
url https://digilib.itb.ac.id/gdl/view/39316
_version_ 1821997738771873792