FOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR DESIGN OF 30 FLOOR APARTMENT BUILDING IN DEPOK

30 floor Apartment, in Depok, is a vertical building that has various functions including residential, boarding school and dormitory. This apartment has 30 floors and three basement floors. The retaining wall used for basement excavation construction is diaphragm wall using ground anchor reinforc...

Full description

Saved in:
Bibliographic Details
Main Author: Anggraeni Choirunnisa, Rizki
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/39529
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:39529
spelling id-itb.:395292019-06-26T15:23:37ZFOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR DESIGN OF 30 FLOOR APARTMENT BUILDING IN DEPOK Anggraeni Choirunnisa, Rizki Teknik sipil Indonesia Final Project Diaphragm wall, ground anchor, deflection, safety factor, bore pile, group pile, bearing capacity, settlement foundation, PLAXIS 2D, GROUP PILE, LPILE. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39529 30 floor Apartment, in Depok, is a vertical building that has various functions including residential, boarding school and dormitory. This apartment has 30 floors and three basement floors. The retaining wall used for basement excavation construction is diaphragm wall using ground anchor reinforcement that qualified design criteria including deflection and safety factors. The retaining wall is analyzed manually or by using software based on finite element, namely PLAXIS 2D. Modeling of retaining walls generate analysis of stability, deflection and internal force. In addition, the walls were also analyzed seismically using three methods such as pseudostatic, Mononobe-Okabe, and Wood. From the analysis, the excavation construction was carried out in five stages using two ground anchors. Then the foundation used to support the apartment building is a deep foundation with a type of bored pile with a depth of 13 meters, that grouped into group pile. The foundation is designed with design criteria including bearing capacity and settlement. The software used for pile foundation analysis is GROUP PILE to get the load received by the pile foundation and LPILE to calculate the lateral capacity of the pile. Reinforcement of foundation and diaphragm wall accordance with the regulation of SNI 2847- 2013 concerning Procedures for Planning Concrete Structures for Building Buildings. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
Anggraeni Choirunnisa, Rizki
FOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR DESIGN OF 30 FLOOR APARTMENT BUILDING IN DEPOK
description 30 floor Apartment, in Depok, is a vertical building that has various functions including residential, boarding school and dormitory. This apartment has 30 floors and three basement floors. The retaining wall used for basement excavation construction is diaphragm wall using ground anchor reinforcement that qualified design criteria including deflection and safety factors. The retaining wall is analyzed manually or by using software based on finite element, namely PLAXIS 2D. Modeling of retaining walls generate analysis of stability, deflection and internal force. In addition, the walls were also analyzed seismically using three methods such as pseudostatic, Mononobe-Okabe, and Wood. From the analysis, the excavation construction was carried out in five stages using two ground anchors. Then the foundation used to support the apartment building is a deep foundation with a type of bored pile with a depth of 13 meters, that grouped into group pile. The foundation is designed with design criteria including bearing capacity and settlement. The software used for pile foundation analysis is GROUP PILE to get the load received by the pile foundation and LPILE to calculate the lateral capacity of the pile. Reinforcement of foundation and diaphragm wall accordance with the regulation of SNI 2847- 2013 concerning Procedures for Planning Concrete Structures for Building Buildings.
format Final Project
author Anggraeni Choirunnisa, Rizki
author_facet Anggraeni Choirunnisa, Rizki
author_sort Anggraeni Choirunnisa, Rizki
title FOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR DESIGN OF 30 FLOOR APARTMENT BUILDING IN DEPOK
title_short FOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR DESIGN OF 30 FLOOR APARTMENT BUILDING IN DEPOK
title_full FOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR DESIGN OF 30 FLOOR APARTMENT BUILDING IN DEPOK
title_fullStr FOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR DESIGN OF 30 FLOOR APARTMENT BUILDING IN DEPOK
title_full_unstemmed FOUNDATION AND DIAPHRAGM WALL WITH GROUND ANCHOR DESIGN OF 30 FLOOR APARTMENT BUILDING IN DEPOK
title_sort foundation and diaphragm wall with ground anchor design of 30 floor apartment building in depok
url https://digilib.itb.ac.id/gdl/view/39529
_version_ 1822269283926802432