CAPACITY PLANNING MODEL BASED ON CRITICAL RESOURCES
In term of production planning and control system based on MRP II (Manufacturing Resource Planning), MPS validation is doing by RCCP (Rough Cut Capacity Planning) before the process continue to MRP (Material Requirement Planning). If MPS is unfeasible, then Management should increase capacity or...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39686 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |