CAPACITY PLANNING MODEL BASED ON CRITICAL RESOURCES

In term of production planning and control system based on MRP II (Manufacturing Resource Planning), MPS validation is doing by RCCP (Rough Cut Capacity Planning) before the process continue to MRP (Material Requirement Planning). If MPS is unfeasible, then Management should increase capacity or...

Full description

Saved in:
Bibliographic Details
Main Author: AFANDI HUDZAIFAH, MUHAMMAD
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/39686
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia