CAPACITY PLANNING MODEL BASED ON CRITICAL RESOURCES
In term of production planning and control system based on MRP II (Manufacturing Resource Planning), MPS validation is doing by RCCP (Rough Cut Capacity Planning) before the process continue to MRP (Material Requirement Planning). If MPS is unfeasible, then Management should increase capacity or...
Saved in:
Main Author: | AFANDI HUDZAIFAH, MUHAMMAD |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39686 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Simulation-based planning for precast production with two critical resources
by: Zhai, X., et al.
Published: (2014) -
Simulation-based planning for precast production with two critical resources
by: Zhai, X., et al.
Published: (2014) -
Enterprise Resource Planning : critical success factors for implementation.
by: Goh, Karen Sher Chin., et al.
Published: (2008) -
EVALUATION AND SCENARIO PLANNING FOR IMPROVING WATER RESOURCES CARRYING CAPACITY OF THE DELI WATERSHED
by: Zulfa Hanie, Meidina -
THE INFLUENCE OF DYNAMIC DEVELOPMENT OF URBAN AREA ON LAND SETTLEMENT CAPACITY
by: Fadlan Afandi, Muhammad