DESIGN OF ENERGY-SAVING SOLAR ENERGY LAMP (LTSHE) CONTROL SYSTEM WITH PULSE-WIDTH MODULATION (PWM) METHOD FOR 3T REGIONS IN INDONESIA

As a large developing country, Indonesia still faces many problems in its development. As an archipelagic country, many islands are not yet interconnected by electricity because of the large amount of investment that Indonesia must provide in a short time. The government launched a pre-electrific...

Full description

Saved in:
Bibliographic Details
Main Author: Setyawan, Wahyu
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/39727
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia