IMPROVEMENT OF MATERIAL TRACKING USING THE WEB BASIS SYSTEM CASE STUDY: MATERIAL TRACKING ON EPCC (ENGINEERING, PROCUREMENT, CONSTRUCTION, AND COMMISSIONING PROJECTS) DEVELOPMENT OF ANTAM NIKEL FERO FACTORY IN EAST HALMAHERA
In a construction project, especially the EPC (Engineering, Procurement and Construction), procurement has a large portion which is around 50% - 60% with a variety types of material that are many and complex. To overcome this challenge, it is important to have a reliability tracking material, so wit...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39757 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |