COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA

In southeast province of Indonesia especially in hinterland area, there are few unique risk factors that cause cost overrun such as low level of understanding about the importance of road infrastructure, difficulties of heavy equipment procurement, and lack of competent human resources. Most of t...

Full description

Saved in:
Bibliographic Details
Main Author: Rusdian La Ola, Muhammad
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/39908
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:39908
spelling id-itb.:399082019-06-28T13:42:03ZCOST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA Rusdian La Ola, Muhammad Teknik sipil Indonesia Theses significant risks, cost overrun, road infrastructure. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39908 In southeast province of Indonesia especially in hinterland area, there are few unique risk factors that cause cost overrun such as low level of understanding about the importance of road infrastructure, difficulties of heavy equipment procurement, and lack of competent human resources. Most of those factors arise because of geographic condition. They become special challenge for contractors that working on national road infrastructure in there. This research aims to identify risk factors that cause cost overrun in national road infrastructure project and analyze those risk factors to get significant risks that cause cost overrun based on contractor perspective. This research methodology based on qualitative and quantitative analysis that requires data from study literature, quizionaire, and interview. Results of this research show that there are 50 risk factors causing cost overrun where in it 8 significant risks that occur in research object. furthermore, this research shows that the impact of significant risks cost overrun of total cost project are 4,159% mean, 4,047% minimum, and 4,511% maximum. therefore, there are few jobs that have high sensitivity towards cost overrun project because of significant risks. Those jobs should be more profesionally managed because those jobs can give highly impact for total cost overrun project. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
Rusdian La Ola, Muhammad
COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA
description In southeast province of Indonesia especially in hinterland area, there are few unique risk factors that cause cost overrun such as low level of understanding about the importance of road infrastructure, difficulties of heavy equipment procurement, and lack of competent human resources. Most of those factors arise because of geographic condition. They become special challenge for contractors that working on national road infrastructure in there. This research aims to identify risk factors that cause cost overrun in national road infrastructure project and analyze those risk factors to get significant risks that cause cost overrun based on contractor perspective. This research methodology based on qualitative and quantitative analysis that requires data from study literature, quizionaire, and interview. Results of this research show that there are 50 risk factors causing cost overrun where in it 8 significant risks that occur in research object. furthermore, this research shows that the impact of significant risks cost overrun of total cost project are 4,159% mean, 4,047% minimum, and 4,511% maximum. therefore, there are few jobs that have high sensitivity towards cost overrun project because of significant risks. Those jobs should be more profesionally managed because those jobs can give highly impact for total cost overrun project.
format Theses
author Rusdian La Ola, Muhammad
author_facet Rusdian La Ola, Muhammad
author_sort Rusdian La Ola, Muhammad
title COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA
title_short COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA
title_full COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA
title_fullStr COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA
title_full_unstemmed COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA
title_sort cost risk analysis of road construction project in southeast sulawesi province indonesia
url https://digilib.itb.ac.id/gdl/view/39908
_version_ 1822925509221154816