COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA
In southeast province of Indonesia especially in hinterland area, there are few unique risk factors that cause cost overrun such as low level of understanding about the importance of road infrastructure, difficulties of heavy equipment procurement, and lack of competent human resources. Most of t...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/39908 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:39908 |
---|---|
spelling |
id-itb.:399082019-06-28T13:42:03ZCOST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA Rusdian La Ola, Muhammad Teknik sipil Indonesia Theses significant risks, cost overrun, road infrastructure. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39908 In southeast province of Indonesia especially in hinterland area, there are few unique risk factors that cause cost overrun such as low level of understanding about the importance of road infrastructure, difficulties of heavy equipment procurement, and lack of competent human resources. Most of those factors arise because of geographic condition. They become special challenge for contractors that working on national road infrastructure in there. This research aims to identify risk factors that cause cost overrun in national road infrastructure project and analyze those risk factors to get significant risks that cause cost overrun based on contractor perspective. This research methodology based on qualitative and quantitative analysis that requires data from study literature, quizionaire, and interview. Results of this research show that there are 50 risk factors causing cost overrun where in it 8 significant risks that occur in research object. furthermore, this research shows that the impact of significant risks cost overrun of total cost project are 4,159% mean, 4,047% minimum, and 4,511% maximum. therefore, there are few jobs that have high sensitivity towards cost overrun project because of significant risks. Those jobs should be more profesionally managed because those jobs can give highly impact for total cost overrun project. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik sipil |
spellingShingle |
Teknik sipil Rusdian La Ola, Muhammad COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA |
description |
In southeast province of Indonesia especially in hinterland area, there are few unique risk
factors that cause cost overrun such as low level of understanding about the importance of road
infrastructure, difficulties of heavy equipment procurement, and lack of competent human
resources. Most of those factors arise because of geographic condition. They become special
challenge for contractors that working on national road infrastructure in there. This research
aims to identify risk factors that cause cost overrun in national road infrastructure project and
analyze those risk factors to get significant risks that cause cost overrun based on contractor
perspective. This research methodology based on qualitative and quantitative analysis that
requires data from study literature, quizionaire, and interview. Results of this research show that
there are 50 risk factors causing cost overrun where in it 8 significant risks that occur in
research object. furthermore, this research shows that the impact of significant risks cost
overrun of total cost project are 4,159% mean, 4,047% minimum, and 4,511% maximum.
therefore, there are few jobs that have high sensitivity towards cost overrun project because of
significant risks. Those jobs should be more profesionally managed because those jobs can give
highly impact for total cost overrun project. |
format |
Theses |
author |
Rusdian La Ola, Muhammad |
author_facet |
Rusdian La Ola, Muhammad |
author_sort |
Rusdian La Ola, Muhammad |
title |
COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA |
title_short |
COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA |
title_full |
COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA |
title_fullStr |
COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA |
title_full_unstemmed |
COST RISK ANALYSIS OF ROAD CONSTRUCTION PROJECT IN SOUTHEAST SULAWESI PROVINCE INDONESIA |
title_sort |
cost risk analysis of road construction project in southeast sulawesi province indonesia |
url |
https://digilib.itb.ac.id/gdl/view/39908 |
_version_ |
1822925509221154816 |