OPTIMIZATION OF HYBRID POWER PLANTS WITH PV PENETRATION: LOW, MEDIUM, AND HIGH, IN HOLTEKAMP, WAENA, AND YARMOKH SUBSTATION, STUDY CASE JAYAPURA POWER GRID
In an era where technology is very developed as it is now, humans are very dependent on the existence of electricity to support their activities. To get electricity, a power plant is used. In Indonesia, power plants are dominated by conventional power plants, one of which is a diesel power plant....
Saved in:
Main Author: | Pramana Fitrah, Adam |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40013 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMIZATION OF HYBRID POWER SYSTEM WITH PV PENETRATION : LOW, MEDIUM, AND HIGH FOR SENTANI SUBSTATION AND MERAH SUBSTATION (STUDY CASE JAYAPURA GRID)
by: Soadamara, Alamson -
PERANCANGAN PIPA PENYALUR HIGH SPEED DIESEL (HSD) STUDI KASUS: HOLTEKAMP JAYAPURA
by: Feriansyah, Fajar -
Grid-connected CSI for hybrid PV/wind power generation system
by: Amorndechaphon D., et al.
Published: (2017) -
Grid-connected CSI for hybrid PV/wind power generation system
by: D. Amorndechaphon, et al.
Published: (2018) -
Review of power system impacts at high PV penetration Part I: Factors limiting PV penetration
by: Gandhi, O, et al.
Published: (2020)