GAS LIFT SPACING DESIGN METHOD FOR UNCONVENTIONAL RESERVOIR WELL
The rapid decline production rate is one of the obstacles to produce well from the unconventional reservoir. Thus, the artificial lift is deployed as the strategy to produce unconventional reservoir economically. Gas lift is favored by the operators due to low cost and flexibility. However, the diff...
Saved in:
Main Author: | Indira Puspita Sari, Maria |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40154 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PREDICTING FUTURE GAS WELL INFLOW PERFORMANCE RELATIONSHIP ON UNCONVENTIONAL RESERVOIR
by: Dwi Febrian Manik, Michael -
A DELIVERABILITY METHOD FOR ESTIMATING STABILIZED GAS WELL PERFORMANCE DURING TRANSIENT PERIODS ON UNCONVENTIONAL RESERVOIR
by: Orliando, Calvin -
PREDICTING STABILIZED OIL WELL INFLOW PERFORMANCE RELATIONSHIP ON UNCONVENTIONAL RESERVOIR
by: Pustika Purwanto, Liviana -
EQUALIZED METHOD: A NEW METHOD TO OPTIMIZE GAS LIFT SPACING DESIGN
by: Perwira Indro, Axel -
PENCIL TYPE GAS LIFT IMPLEMENTATION IN MULTILAYERED RESERVOIR FOR POTENTIAL PRODUCTION IMPROVEMENT OF WELL-X
by: Putu Adzkia, Mahda