IMPLEMENTATION OF FUZZY LOGIC SYSTEM IN DEVELOPMENT OF THE GREEN CONSTRUCTION ASSESSMENT MODEL IN THE CONSTRUCTION PROCESS FOR BUILDING PROJECTS IN INDONESIA

The development of the practice of green constructon in Indonesia is still very poor. This can be caused by a lack of awareness of parties related to construction practices. With the existence of a special system to assess the construction process performance in the management aspects of environment...

Full description

Saved in:
Bibliographic Details
Main Author: Triana Putri, Andira
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/40211
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia